Secure the paver finisher in its position to the low-bed trailer:
- Use only proper and permitted
load fastening devices.
- Use the four securing points provided (1, 2).
A
Depending on the equipment of the machine there can be further support points (3)
on the auger frame (3).
- Wait until the exhaust extension pipe has cooled down; then remove it and store it.
2.4
After transportation
- Remove the attachment devices.
- Swing up the protective roof: take out the bolts, push the protective roof forward to
raise it and insert the bolts to lock it again.
- Mount the protective tarpaulin if it has been removed.
- Lift the screed to the transportation position and lock it.
- Start the engine and drive from the trailer at a low engine/traction speed.
- Park the paver finisher in a secure spot, lower the screed and switch off the engine.
- Remove the key and/or cover the operating panel with the protective hood and se-
cure it.
Summary of Contents for Svedala Demag DF 115 P/D
Page 2: ...VALUE QUALITY THE ORIGINAL Your Authorized Dynapac Dealer...
Page 10: ......
Page 18: ......
Page 20: ......
Page 44: ......
Page 60: ...D 1 3 4 D_1 3_01_GB fm 4 24 Element2_konv_Rad_634 bmp 9 12 9a 5 8 14 A 6 7 13 10 11...
Page 62: ...D 1 3 6 D_1 3_01_GB fm 6 24 Element2_konv_Rad_634 bmp 9 12 9a 5 8 14 A 6 7 13 10 11...
Page 80: ...D 1 3 24 D_1 3_01_GB fm 24 24...
Page 120: ...D 4 5 24 D_4 5_01_GB fm 24 34 2 2 Error messages...
Page 121: ...D 4 5 25 D_4 5_01_GB fm 25 34...
Page 122: ...D 4 5 26 D_4 5_01_GB fm 26 34...
Page 123: ...D 4 5 27 D_4 5_01_GB fm 27 34...
Page 124: ...D 4 5 28 D_4 5_01_GB fm 28 34...
Page 125: ...D 4 5 29 D_4 5_01_GB fm 29 34 2 3 FMI codes...
Page 142: ...E 01 12 E_01_GB fm 12 18 3 Auger extension auger type II Auger_DEM bmp...
Page 148: ......
Page 150: ......
Page 153: ...F 3 0 1 F_3 0_01_GB fm 1 4 F 3 0 Maintenance Conveyor 1 Maintenance Conveyor...
Page 157: ...F 4 1 1 F_4 1_01_GB fm 1 8 F 4 1 Maintenance Auger 1 Maintenance auger sub unit...
Page 164: ......
Page 176: ......
Page 177: ...F 6 0 1 F_6 0_01_GB fm 1 8 F 6 0 Maintenance Hydraulic system 1 Maintenance hydraulic system...
Page 190: ......
Page 218: ......
Page 219: ...F 10 0 1 F_10 0_01_GB fm 1 6 F 10 0 Checks decommissioning 1 Tests check up cleaning stopping...
Page 224: ......
Page 232: ......