D 4.5 19
D_4
.5_0
1_G
B.
fm
1
9
-3
4
When work is finished
- Run the paver finisher empty and stop
it.
- Lift the screed. Set the switch (1) to
mid-position, switch (2) to the upper
position and switch (3) to lifting.
- Retract the screed parts to the basic
screed width and lift the auger. Where
applicable, completely extend the lev-
elling cylinders.
- Insert the mechanic screed transport
safeguard (74) on both screed lifting
cylinders.
- While operating the tampers at a low
speed, let any material residues drop
out.
- Set the drive lever (5) to the center po-
sition and the speed adjuster (6) to
minimum
- Switch off the ignition.
- Switch off screed heater (system).
- When screed is operated with the op-
tional gas heating system, close the
main shut-off valves and the valves of
the bottles.
- Remove the levelling units and stow
them away in the boxes, close all flaps
- Remove all parts that extend beyond
the paver finisher contour or secure
them if the paver finisher is to be trans-
ported over public roads on a low-bed
trailer.
Element1_konv_Kette_635.bmp
2
3
1
F0083_A1.TIF
74
Element2_konv_Rad_634.bmp
6
5
Summary of Contents for Svedala Demag DF 115 P/D
Page 2: ...VALUE QUALITY THE ORIGINAL Your Authorized Dynapac Dealer...
Page 10: ......
Page 18: ......
Page 20: ......
Page 44: ......
Page 60: ...D 1 3 4 D_1 3_01_GB fm 4 24 Element2_konv_Rad_634 bmp 9 12 9a 5 8 14 A 6 7 13 10 11...
Page 62: ...D 1 3 6 D_1 3_01_GB fm 6 24 Element2_konv_Rad_634 bmp 9 12 9a 5 8 14 A 6 7 13 10 11...
Page 80: ...D 1 3 24 D_1 3_01_GB fm 24 24...
Page 120: ...D 4 5 24 D_4 5_01_GB fm 24 34 2 2 Error messages...
Page 121: ...D 4 5 25 D_4 5_01_GB fm 25 34...
Page 122: ...D 4 5 26 D_4 5_01_GB fm 26 34...
Page 123: ...D 4 5 27 D_4 5_01_GB fm 27 34...
Page 124: ...D 4 5 28 D_4 5_01_GB fm 28 34...
Page 125: ...D 4 5 29 D_4 5_01_GB fm 29 34 2 3 FMI codes...
Page 142: ...E 01 12 E_01_GB fm 12 18 3 Auger extension auger type II Auger_DEM bmp...
Page 148: ......
Page 150: ......
Page 153: ...F 3 0 1 F_3 0_01_GB fm 1 4 F 3 0 Maintenance Conveyor 1 Maintenance Conveyor...
Page 157: ...F 4 1 1 F_4 1_01_GB fm 1 8 F 4 1 Maintenance Auger 1 Maintenance auger sub unit...
Page 164: ......
Page 176: ......
Page 177: ...F 6 0 1 F_6 0_01_GB fm 1 8 F 6 0 Maintenance Hydraulic system 1 Maintenance hydraulic system...
Page 190: ......
Page 218: ......
Page 219: ...F 10 0 1 F_10 0_01_GB fm 1 6 F 10 0 Checks decommissioning 1 Tests check up cleaning stopping...
Page 224: ......
Page 232: ......