3. dynabook WPETD Operation 3 Diagnostic Programs
3-9 Maintenance Manual Satellite Pro E10-S / dynabook E10-S
3-3-2 Each item for the operations
[All Items Check] check box
Check this box, you can select or deselect all test items.
[All Detail Check] check box
Check this box, you can select or deselect all test items in detail.
[Multitask] check box
Only for Aging tests.
If you check this box, the selected Aging-tests will run simultaneously.
If you uncheck it, the selected Aging tests are executed one by one.
[Pass Count] edit box
Only for Aging tests
Set the number of times for a test, which allows you to specify from 1 to 999.
Each Aging test runs until reaching "Pass Count" you set.
If you also set "Multitask" option, all selected Aging tests will keep running until
when the last one reaches the "Pass Count".
However, if an Aging test gets error 10 times, the test item will be terminated.
[CPU Stress] check box
Only for Aging tests
Checking this box applies some stress to the CPU during the test.
[Set Battery Off At the End] check box
if you check this box, it will run battery off test/setting once at the end of all tests.
Default is checked. And it will be grayed out and unchecked if no battery or the
running PC cannot be supported (Currently only Taikan10 model is supported) by
this item [Set Battery Off At the End].
[START] button
Start the test.
[LOG] button
Shows the detailed test result or to save it.
[STOP] button
Stops the test during the execution.
This button is effective for each Aging test and at the interval between two Non-
Aging tests.
Diagnostics Time
The elapsed time for the test
Summary of Contents for E10-S
Page 1: ...1 i 1 Chapter 1 Hardware Overview...
Page 16: ...2 Chapter 2 Troubleshooting...
Page 47: ...Chapter 3 Diagnostic Programs...
Page 50: ......
Page 64: ......
Page 89: ...5 Appendix 3 Diagnostic Programs 3 41 Maintenance Manual Satellite Pro E10 S dynabook E10 S...
Page 92: ......
Page 96: ......
Page 102: ......
Page 104: ......
Page 110: ...4 Replacement Procedures 4 Chapter 4 Replacement Procedures...