. .
Dyadic Systems – Mechatronics Cylinder Manual
MF
-005500-EN-12/63
3. Start Up
3.1. Preparation
3.1.1. Check if there is any damage
Please check the appearance of the product to ensure no damage occurred during transportation.
3.1.2 Check if the product is correct
Please verify that the product is the same as ordered.
3.1.3 Power Supply
Please provide a power source. (Regulated DC24V)
3.1.4. Tools
Tools will be required to work on wiring and connecting. (Wire Stripper, Wire connectors, etc.)
3.1.5. Programming Tool
An individual Mechatronics Cylinder doesn’t include programming tools such as the Teach Pendant or
PC Tool (TBVST-EN). These items are sold separately.
3.2. Wire the Power/IO cable and run from the PC programming tool
3.2.1. Check the Power & I/O cable:
Connection Example (SCN5 Model)
3.2.2. Check Parallel Connector Cable
The parallel cable includes the power and signal cable required to run the Mechatronics Cylinder from a
PLC and/or switches.
Connect the Power & I/O
cable (Parallel cable)
Connect the ADP Cable for
communication with the PC
Programming Tool or a
teach pendant
Models Power
cable
SCN5-Amp built-in:
RP9100-XXX
SCN6 and all SCL
actuators:
RP9120-XXX