Needle bar
38
Service Instructions 755 A/756 A - 00.0 - 02/2019
Fig. 27: Assembling the needle bar linkage (3)
7. Push the pin completely into lever (7) and then further into lever (11).
8. Tighten the screws (10).
The thread lever (8) must be able to move freely.
The thread lever (8) is automatically positioned correctly when the
screws (9) on the face of the pin have been tightened.
9. Slightly loosen the screws (9) and slowly complete 2-3 turns at the
handwheel.
The components are released from tension mechanically.
10. Tighten the screws (9).
11. Tie the oil wick (3) to the felt (2).
Fig. 28: Assembling the needle bar linkage (4)
(7)
- Lever
(8)
- Thread lever
(9)
- Screws
(10) - Screws
(11) - Lever
⑪
⑦
⑨
⑩
⑧
(12) - Screw
(13) - Gear tongues
⑫
⑬
Summary of Contents for 755 A
Page 1: ...755 A 756 A Service Instructions...
Page 8: ...Table of Contents 6 Service Instructions 755 A 756 A 00 0 02 2019...
Page 12: ...About these instructions 10 Service Instructions 755 A 756 A 00 0 02 2019...
Page 116: ...Folder 114 Service Instructions 755 A 756 A 00 0 02 2019...
Page 124: ...Transport carriage 122 Service Instructions 755 A 756 A 00 0 02 2019...
Page 138: ...Transport clamps 136 Service Instructions 755 A 756 A 00 0 02 2019...
Page 200: ...Light barriers 198 Service Instructions 755 A 756 A 00 0 02 2019...
Page 222: ...Endless zipper feed optional 220 Service Instructions 755 A 756 A 00 0 02 2019...
Page 238: ...Additional equipment 236 Service Instructions 755 A 756 A 00 0 02 2019...
Page 266: ...Stacker 264 Service Instructions 755 A 756 A 00 0 02 2019...
Page 438: ...Programming 436 Service Instructions 755 A 756 A 00 0 02 2019...
Page 450: ...Decommissioning 448 Service Instructions 755 A 756 A 00 0 02 2019...
Page 452: ...Disposal 450 Service Instructions 755 A 756 A 00 0 02 2019...
Page 472: ...Technical data 470 Service Instructions 755 A 756 A 00 0 02 2019...
Page 496: ...Appendix 494 Service Instructions 755 A 756 A 00 0 02 2019...
Page 497: ......