Stacker
Service Instructions 755 A/756 A - 00.0 - 02/2019
243
28.2 Throw-over stacker
To activate the throw-over stacker:
Open the menu
Service > Machine config. > Stacker/Pincer
Stacker/Smoother/Blow-Off
and press the button
(throw-over
stacker) (
28.2.1 Assembling the throw-over stacker
Fig. 237: Assembling the throw-over stacker (1)
To assemble the throw-over stacker:
1. Tighten the holder (1) to the stand using the screws (2).
Dimension
X
: no more than 15 cm, depending on the parts to be
stacked.
2. Grease the hole (3).
(1)
- Holder
(2)
- Screws
(3)
- Hole
②
①
①
③
X
Summary of Contents for 755 A
Page 1: ...755 A 756 A Service Instructions...
Page 8: ...Table of Contents 6 Service Instructions 755 A 756 A 00 0 02 2019...
Page 12: ...About these instructions 10 Service Instructions 755 A 756 A 00 0 02 2019...
Page 116: ...Folder 114 Service Instructions 755 A 756 A 00 0 02 2019...
Page 124: ...Transport carriage 122 Service Instructions 755 A 756 A 00 0 02 2019...
Page 138: ...Transport clamps 136 Service Instructions 755 A 756 A 00 0 02 2019...
Page 200: ...Light barriers 198 Service Instructions 755 A 756 A 00 0 02 2019...
Page 222: ...Endless zipper feed optional 220 Service Instructions 755 A 756 A 00 0 02 2019...
Page 238: ...Additional equipment 236 Service Instructions 755 A 756 A 00 0 02 2019...
Page 266: ...Stacker 264 Service Instructions 755 A 756 A 00 0 02 2019...
Page 438: ...Programming 436 Service Instructions 755 A 756 A 00 0 02 2019...
Page 450: ...Decommissioning 448 Service Instructions 755 A 756 A 00 0 02 2019...
Page 452: ...Disposal 450 Service Instructions 755 A 756 A 00 0 02 2019...
Page 472: ...Technical data 470 Service Instructions 755 A 756 A 00 0 02 2019...
Page 496: ...Appendix 494 Service Instructions 755 A 756 A 00 0 02 2019...
Page 497: ......