Needle bar
36
Service Instructions 755 A/756 A - 00.0 - 02/2019
Fig. 23: Disassembling the needle bar linkage (2)
12. Loosen the screw (10).
13. Loosen the screws (9).
14. Use a suitable tool to push the bolt inside the lever (8) completely out
of the lever (8).
The thread lever is loose.
Fig. 24: Disassembling the needle bar linkage (3)
15. Turn the handwheel until the next screws on the arm shaft crank are
accessible.
16. Loosen the screws (11).
17. Tie the oil wick (12) off the felt (13).
18. Pull the needle bar linkage (7) including thread lever and oil wick (12)
out of the machine head.
(8)
- Lever
(9)
- Screws
(10) - Screw
⑧
⑨
⑩
(11) - Screws
(12) - Oil wick
(13) - Felt
⑪
⑫ ⑬
Summary of Contents for 755 A
Page 1: ...755 A 756 A Service Instructions...
Page 8: ...Table of Contents 6 Service Instructions 755 A 756 A 00 0 02 2019...
Page 12: ...About these instructions 10 Service Instructions 755 A 756 A 00 0 02 2019...
Page 116: ...Folder 114 Service Instructions 755 A 756 A 00 0 02 2019...
Page 124: ...Transport carriage 122 Service Instructions 755 A 756 A 00 0 02 2019...
Page 138: ...Transport clamps 136 Service Instructions 755 A 756 A 00 0 02 2019...
Page 200: ...Light barriers 198 Service Instructions 755 A 756 A 00 0 02 2019...
Page 222: ...Endless zipper feed optional 220 Service Instructions 755 A 756 A 00 0 02 2019...
Page 238: ...Additional equipment 236 Service Instructions 755 A 756 A 00 0 02 2019...
Page 266: ...Stacker 264 Service Instructions 755 A 756 A 00 0 02 2019...
Page 438: ...Programming 436 Service Instructions 755 A 756 A 00 0 02 2019...
Page 450: ...Decommissioning 448 Service Instructions 755 A 756 A 00 0 02 2019...
Page 452: ...Disposal 450 Service Instructions 755 A 756 A 00 0 02 2019...
Page 472: ...Technical data 470 Service Instructions 755 A 756 A 00 0 02 2019...
Page 496: ...Appendix 494 Service Instructions 755 A 756 A 00 0 02 2019...
Page 497: ......