Stacker
240
Service Instructions 755 A/756 A - 00.0 - 02/2019
Fig. 234: Assembling the pincer stacker (3)
8. Lay the pneumatic line of the throttle valves (9) to pneumatic
valve Y25 (7).
Lay the pneumatic line to the throttle valves (9) to pneumatic
valve Y26 (6).
Route the pneumatic lines through the pincer stacker stand and fix
them in place using cable ties.
Fig. 235: Assembling the pincer stacker (4)
9. Lay the grounding wires (10) and (11) from the pincer stacker to
the stand.
(8)
- Throttle valves
(9)
- Throttle valves
⑧
⑨
(10) - Grounding wire
(11) - Grounding wire
⑩
⑪
⑩
⑪
Summary of Contents for 755 A
Page 1: ...755 A 756 A Service Instructions...
Page 8: ...Table of Contents 6 Service Instructions 755 A 756 A 00 0 02 2019...
Page 12: ...About these instructions 10 Service Instructions 755 A 756 A 00 0 02 2019...
Page 116: ...Folder 114 Service Instructions 755 A 756 A 00 0 02 2019...
Page 124: ...Transport carriage 122 Service Instructions 755 A 756 A 00 0 02 2019...
Page 138: ...Transport clamps 136 Service Instructions 755 A 756 A 00 0 02 2019...
Page 200: ...Light barriers 198 Service Instructions 755 A 756 A 00 0 02 2019...
Page 222: ...Endless zipper feed optional 220 Service Instructions 755 A 756 A 00 0 02 2019...
Page 238: ...Additional equipment 236 Service Instructions 755 A 756 A 00 0 02 2019...
Page 266: ...Stacker 264 Service Instructions 755 A 756 A 00 0 02 2019...
Page 438: ...Programming 436 Service Instructions 755 A 756 A 00 0 02 2019...
Page 450: ...Decommissioning 448 Service Instructions 755 A 756 A 00 0 02 2019...
Page 452: ...Disposal 450 Service Instructions 755 A 756 A 00 0 02 2019...
Page 472: ...Technical data 470 Service Instructions 755 A 756 A 00 0 02 2019...
Page 496: ...Appendix 494 Service Instructions 755 A 756 A 00 0 02 2019...
Page 497: ......