Stacker
254
Service Instructions 755 A/756 A - 00.0 - 02/2019
28.3 Setting the stacker brackets
Setting the front clamping bracket
Fig. 249: Setting the stacker brackets (1)
To set the front clamping bracket:
1. Check if the stop (3) is set to the correct position (
2. Loosen the screws (4).
3. Position the front clamping bracket (1) at stop (3).
4. Press the pneumatic cylinder (5) into its end position.
5. Set the throw-over stacker (2) to its rear position.
The distance between the front clamping bracket (1) and the throw-
over stacker (2) is approx. 12 mm.
6. Tighten the screws (4).
(1)
- Front clamping bracket
(2)
- Throw-over bracket
(3)
- Stop
(4)
- Screws
(5)
- Pneumatic cylinder
③
④
⑤
①
②
12 mm
Summary of Contents for 755 A
Page 1: ...755 A 756 A Service Instructions...
Page 8: ...Table of Contents 6 Service Instructions 755 A 756 A 00 0 02 2019...
Page 12: ...About these instructions 10 Service Instructions 755 A 756 A 00 0 02 2019...
Page 116: ...Folder 114 Service Instructions 755 A 756 A 00 0 02 2019...
Page 124: ...Transport carriage 122 Service Instructions 755 A 756 A 00 0 02 2019...
Page 138: ...Transport clamps 136 Service Instructions 755 A 756 A 00 0 02 2019...
Page 200: ...Light barriers 198 Service Instructions 755 A 756 A 00 0 02 2019...
Page 222: ...Endless zipper feed optional 220 Service Instructions 755 A 756 A 00 0 02 2019...
Page 238: ...Additional equipment 236 Service Instructions 755 A 756 A 00 0 02 2019...
Page 266: ...Stacker 264 Service Instructions 755 A 756 A 00 0 02 2019...
Page 438: ...Programming 436 Service Instructions 755 A 756 A 00 0 02 2019...
Page 450: ...Decommissioning 448 Service Instructions 755 A 756 A 00 0 02 2019...
Page 452: ...Disposal 450 Service Instructions 755 A 756 A 00 0 02 2019...
Page 472: ...Technical data 470 Service Instructions 755 A 756 A 00 0 02 2019...
Page 496: ...Appendix 494 Service Instructions 755 A 756 A 00 0 02 2019...
Page 497: ......