
Operation
Operating Instructions 512/532 - 05.0 - 04/2018
21
Insert a full bobbin
To insert a full bobbin:
1.
Insert the full bobbin into the bobbin housing upper section (2).
2.
Feed the hook thread through the bobbin housing slot (7)
under the tensioning spring (5) into the hole (4).
3.
Pull the hook thread approx. 2.5 cm out of the bobbin housing
upper (2).
The bobbin must rotate in the direction of the arrow when
pulling out the hook thread.
4.
Insert the bobbin housing upper (2).
5.
Close the hook cover (3).
Summary of Contents for 512/532
Page 1: ...Operating Instructions 512 532 ...
Page 6: ...Table of Contents 4 Operating Instructions 512 532 05 0 04 2018 ...
Page 16: ...Safety 14 Operating Instructions 512 532 05 0 04 2018 ...
Page 60: ...Programming 58 Operating Instructions 512 532 05 0 04 2018 ...
Page 70: ...Maintenance 68 Operating Instructions 512 532 05 0 04 2018 ...
Page 86: ...Decommissioning 84 Operating Instructions 512 532 05 0 04 2018 ...
Page 88: ...Disposal 86 Operating Instructions 512 532 05 0 04 2018 ...
Page 97: ...Appendix Operating Instructions 512 532 05 0 04 2018 95 11 Appendix ...
Page 98: ...Appendix 96 Operating Instructions 512 532 05 0 04 2018 ...
Page 99: ......