Annexe
73
en
10
Annexe
Optimum test sequence using the Dräger RZ 7000
Residual Pressure Warning
Close cylinder
Alarm at approx. 55 bar
Battery Charge
Remove PSS BG 4 RP from RZ 7000
Deactivate Bodyguard
Insert protective cap
High Pressure Leak Test
(optional)
Open cylinder
≥ 165 bar
Close Open
Constant Metering
Valve & Bypass
Insert protective cap on relief valve
Shortly press red button
flow between 1,5 and 1,9 L/min
Minimum Valve
Remove protective cap
flow noise between
0,1 and 4,5 mbar
Drain Valve
Insert protective cap on relief valve
Pump to fill system
opens between 10 and 25 mbar
Leak Test
Reduce pressure to 7 + 0,5 mbar
Press OK button
pressure difference ≤ 1 mbar/min
Relief Valve
Remove protective cap from
relief valve
Pump to activate
opens between 7 and 9 mbar
Low Pressure Warning
Pump slowly
Alarm before 1,4 mbar
Inhalation Valve
Close exhalation hose
≥ 10 mbar must be reached
Exhalation Valve
Close inhalation hose
≤ -10 mbar must be reached
Battery full
Test Sequence
positive pressure
venting
leak test
negative pressure
L/min
flow
for devices with approval according to Gost R 53259-2009
Summary of Contents for PSS BG 4 RP
Page 1: ...Dr ger PSS BG 4 RP i ru 4 en Instructions for Use 40...
Page 2: ......
Page 9: ...9 ru 2 7 2 7 1 Dr ger Dr ger Dr ger Dr ger Dr ger Dr ger i i...
Page 12: ...12 ru Dr ger FPS 7000 RP Panorama Nova RP 1 2 2 7 4 PCas APECas 1 2 i i...
Page 20: ...20 ru 4 1 6 5 6 X X1 X2 X X 3 X CO2 X X4 CO2 X X4 X5 1 2 3 Dr ger 4 CO2 4 5 27 5...
Page 35: ...35 ru 5 6 CO2 CO2 7 Dr ger CO2 Dr ger CO2 1 CO2 2 CO2 Dr ger Dr ger CO2 CO2...
Page 38: ...38 ru PC PCas TR...
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......