![Dover Anthony Complete 101 Series Installation Manual Download Page 59](http://html1.mh-extra.com/html/dover/anthony-complete-101-series/anthony-complete-101-series_installation-manual_2524816059.webp)
Complete 101 Series Installation Manual
99-25517-I001 July 2022 Rev. B
58 |
P a g e w w w . a n t h o n y i n t l . c o m
Figure 13.2 Removing torque rod from the door.
WARNING
Warning: DO NOT use a steel-headed hammer. Use caution when striking any tool with another tool. DO
NOT use excessive force when striking the screwdriver and potentially damaging the door.
3.
Continue to carefully tap the torque rod, if necessary, until the torque rod and rod end disengages.
4.
Carefully pull the torque rod assembly completely out the door rail.
5.
Reverse the process to re-install the torque rod assembly into the door rail. Refer to Figure 13.3.
•
Insert torque rod into the bottom of the door until it is fully seated.
•
If required, tap the torque rod assembly into the door rail using a plastic or rubber mallet, until the torque rod is fully
seated into the door rail socket.
Figure 13.3 Removing torque rod from the door.
6.
Once this is completed, re-install the door per instructions in Section 4 – Door Installation.
WARNING
Warning: Ensure to apply a minimum of 3 grams of dielectric grease (Anthony P/N: 98-25497-0001) to fill
the holes in the socket as shown in Figure 4.2 in “Section 4 – Door Installation”.