Alternator Installation and Maintenance
Operation & Maintenance Manual
22637300
83
INSTALLATION - COMMISSIONING
Assembly
All mechanical handing operations must be undertaken using approved equipment.
While being handled, the machine should remain horizontal (when travelling bar removed).
Handling
The generously sized lifting rings are for handling the alternator alone. They must not be used
to lift the alternator alone. They must not be used to lift the genset. Choose a lifting system
which respects the positioning of the rings (See Fig.13).
Coupling (Single Bearing Alternator)
Before coupling to the prime mover, check that both are compatible by:
•
Undertaking a torsional analysis of the transmission.
•
Checking the dimensions of the flywheel and its housing, the flange, coupling discs
and offset.
WARNING
!
When coupling the alternator to the prime mover, the holes of the
coupling discs should be aligned with the flywheel holes by cranking the
engine.
Do not use the alternator fan to turn the rotor.
Summary of Contents for G10WMI-2D-T2
Page 2: ...2 ...
Page 5: ...22637300 5 Drawbar Notice ...
Page 7: ...22637300 7 Safety Symbols ...
Page 11: ...Safety Symbols Operation Maintenance Manual 22637300 11 ...
Page 12: ...12 22637300 Always use genuine replacement parts ...
Page 13: ...22637300 13 Safety ...
Page 21: ...22637300 21 General Data ...
Page 28: ...28 22637300 ...
Page 29: ...22637300 29 Operating Instructions ...
Page 36: ...Operation Maintenance Manual Operating Instructions 36 22637300 20 18 19 21 22 ...
Page 54: ...Operation Maintenance Manual Operating Instructions 54 22637300 ...
Page 55: ...Operating Instructions Operation Maintenance Manual 22637300 55 ...
Page 65: ...22637300 65 Maintenance ...
Page 75: ...22637300 75 Alternator Installation and Maintenance ...
Page 103: ...Alternator Installation and Maintenance Operation Maintenance Manual 22637300 103 ...