Operating Instructions
Operation & Maintenance Manual
22637300
49
120/208V 3 Phase
1. Turn Voltage Output Monitor to L
1
-L
2
position.
2. Turn Voltage Adjust Rheostat (VAR) Shaft to read 208V on AC Voltmeter.
3. Turn Voltage Output Monitor to L
2
-L
3
position and verify 208V ± 5%.
4. Turn Voltage Output Monitor to L
3
-L
1
position and verify 208V ± 5%.
5. Turn Voltage Output Monitor to L
1
-L
0
position and verify 120V ± 5%.
6. Shutdown unit.
7. Make 120/208V connections at the direct hook-up terminal blocks.
8. At start-up, 120/208V will be present.
277/480V 3 Phase
1. Turn Voltage Output Monitor to L
1
-L
0
position.
2. Turn Voltage Adjust Rheostat (VAR) Shaft to read 277V on AC Voltmeter.
3. Turn Voltage Output Monitor to L
2
-L
0
position and verify 277V ± 5%.
4. Turn Voltage Output Monitor to L
3
-L
0
position and verify 277V ± 5%.
5. Turn Voltage Output Monitor to L
1
-L
2
position and verify 480V ± 5%.
6. Shutdown unit.
7. Make 277/480V connections at the direct hook-up terminal blocks.
8. At start-up, 277/480V will be available at the direct hook-up terminal blocks.
Summary of Contents for G10WMI-2D-T2
Page 2: ...2 ...
Page 5: ...22637300 5 Drawbar Notice ...
Page 7: ...22637300 7 Safety Symbols ...
Page 11: ...Safety Symbols Operation Maintenance Manual 22637300 11 ...
Page 12: ...12 22637300 Always use genuine replacement parts ...
Page 13: ...22637300 13 Safety ...
Page 21: ...22637300 21 General Data ...
Page 28: ...28 22637300 ...
Page 29: ...22637300 29 Operating Instructions ...
Page 36: ...Operation Maintenance Manual Operating Instructions 36 22637300 20 18 19 21 22 ...
Page 54: ...Operation Maintenance Manual Operating Instructions 54 22637300 ...
Page 55: ...Operating Instructions Operation Maintenance Manual 22637300 55 ...
Page 65: ...22637300 65 Maintenance ...
Page 75: ...22637300 75 Alternator Installation and Maintenance ...
Page 103: ...Alternator Installation and Maintenance Operation Maintenance Manual 22637300 103 ...