SECTION 1 - INSTALLATION
1.1 Underground Conduit Requirements
1.2 Concrete Pad
Operator
Position
Underground depth of the concrete
pad is determined by soil conditions
and local building codes. Reinforced
concrete recommended.
24” Concrete Pad Width
32” Concrete Pad Length Min.
Concrete pad
MUST be level.
Note: Bevel the
edges of concrete
pad to eliminate
water puddling
under the operator.
4” minimum above ground
Conduit Location
24”
Approximate
Conduit Position
CAUTION
NEVER REMOVE HUB
after manual release.
38”
Center Line
3”
Conduit
Area
13” x 6 1/2”
Conduit
Area
19”
to
Center
of
Conduit
Area
6 1/2”
12”
6 1/2”
4 1/2”
27”
to
Center
of
Conduit
Area
13” x 7 1/2”
208/230/460
Step-Down
Transformer
Plate
Prior to beginning the installation of the swing gate operator, we suggest that you become familiar with the
instructions, illustrations, and wiring guide-lines in this manual. This will help insure that your installation is
performed in an efficient and professional manner compliant with UL 325 safety and ASTM F2200 construction
standards.
The proper installation of the vehicular swing gate operator is an extremely important and integral part of the
overall access control system.
Check all local building ordinances and building codes prior to installing
this operator. Be sure your installation is in compliance with local codes.
Sweeps
Concrete
Pad
•
The conduit requirements are for a typical swing gate operator installation.
The conduit requirements for your application may vary
from this depending on your specific needs.
•
Use only sweeps for conduit bends. Do not use 90° elbows as this will make wire pulls very
difficult and can cause damage to wire insulation. DoorKing recommends using 3/4-inch conduit.
•
External Entrapment Protection
is
REQUIRED
(photo sensor and/or reversing edge).
•
Be sure that all conduits are installed in accordance with local codes.
•
Never
run low voltage rated wire insulation in the same conduit as high voltage rated wire insulation.
Elbow
NO
Sweep
YES
External Safety Devices, Controls and P.A.M.S. Wires (Low Voltage wire insulation)
Loop Lead-In Wires (Low Voltage wire insulation)
AC Input Power (High Voltage wire insulation)
Bi-Parting Gate Operators CANNOT be used.