15
The initial inspection and test loading of the Dino aerial work platforms is performed by the
manufacturer. A protocol, drawn up during the inspection, will accompany the lift.
The protocols of the start-up and periodic inspections must be kept with the lift or its
immediate proximity for at least five years.
E
C
I
V
E
D
Y
T
E
F
A
S
.
G
S
E
C
N
A
I
L
P
P
A
C
I
R
T
C
E
L
E
.
E
h
c
ti
w
s
t
i
m
il
y
t
e
f
a
S
.
1
s
e
c
n
a
il
p
p
a
c
ir
t
c
e
l
E
.
1
2. Sound signal
F. CONTROL DEVICES
T
S
E
T
G
N
I
D
A
O
L
.
H
s
n
o
it
c
e
t
o
r
P
.
1
)
%
0
5
1
(
g
k
0
8
1
=
t
s
e
t
d
a
o
lr
e
v
O
.
1
s
n
o
it
c
e
ri
d
/
s
l
o
b
m
y
S
.
2
)
%
0
1
1
(
g
k
2
3
1
=
t
s
e
t
l
a
n
o
it
k
n
u
F
.
2
s
g
n
i
c
a
l
P
.
3
4. Emergency stop
FAILINGS AND NOTES
:
e
r
u
t
a
n
g
i
S
:
e
t
a
D
.
d
e
ri
a
p
e
r
n
e
e
b
e
v
a
h
s
g
n
il
i
a
F
Dinolift Oy
Raikkolantie 145
FIN-32210 LOIMAA, FINLAND
Tel. +358 - 20 - 1772 400, Fax +358 - 2 - 7627 160, e-mail: [email protected]
Summary of Contents for DINO 120T
Page 2: ......
Page 6: ...6 Operating instructions DINO 120T 120TB BLANK...
Page 11: ...11 2 2 REACH DIAGRAM...
Page 45: ...45 BLANK...
Page 50: ...50 Operating instructions DINO 120T 120TB NOTES...
Page 51: ...51 NOTES...
Page 55: ...55 7 2 LUBRICATION PLAN 5 8 6 10 6 7 13 4 2 1 11 3 9 12...
Page 61: ...61 BLANK...
Page 62: ...62 Operating instructions DINO 120T 120TB BLANK...
Page 64: ...64 Operating instructions DINO 120T 120TB NOTES...
Page 65: ...65 NOTES...