
43
min. 2000 mm
5.3.4. Lifting the device
The device can be lifted using the lugs shown in the picture. The lifting lugs are located
symmetrically on both sides of the lift.
During lifting the aerial work platform must be in the transport position. Remove all loose
material from the top of the frame structures and the work platform before lifting.
Use for lifting a suitable crane with sufficient capacity and relevant accessories. Check the
weight of the lift in the technical specifications.
Be careful not to damage the device during the lifting operation.
Summary of Contents for DINO 120T
Page 2: ......
Page 6: ...6 Operating instructions DINO 120T 120TB BLANK...
Page 11: ...11 2 2 REACH DIAGRAM...
Page 45: ...45 BLANK...
Page 50: ...50 Operating instructions DINO 120T 120TB NOTES...
Page 51: ...51 NOTES...
Page 55: ...55 7 2 LUBRICATION PLAN 5 8 6 10 6 7 13 4 2 1 11 3 9 12...
Page 61: ...61 BLANK...
Page 62: ...62 Operating instructions DINO 120T 120TB BLANK...
Page 64: ...64 Operating instructions DINO 120T 120TB NOTES...
Page 65: ...65 NOTES...