
29
4.3.4. Operating controls in the platform control centre
Close the cover of the chassis control centre before operating the controls on the platform.
The cover must not be locked while the lift is in operation.
S4
Emergency stop
S23
Speed selector switch and activation
switch for the movements (is used
simultaneously with the control levers for
the boom and the driving device)
S10
Sound signal button
S12
Lever switch for levelling the platform
S9
Control lever for telescope movement S8
Control lever for the boom
Retracting the telescope
Boom up
Extending the telescope
Boom down
Turning the boom to the right
Turning the boom to the left
Koko 195x198mm
Nimike 4CB4101
Logo päivitetty 30.1.2015 VR
Jänis, kilppari ja torvi päivitetty 19.2.2016 LKö
4CB4101
S12
S10
S9
S8
S23
S4
Summary of Contents for DINO 120T
Page 2: ......
Page 6: ...6 Operating instructions DINO 120T 120TB BLANK...
Page 11: ...11 2 2 REACH DIAGRAM...
Page 45: ...45 BLANK...
Page 50: ...50 Operating instructions DINO 120T 120TB NOTES...
Page 51: ...51 NOTES...
Page 55: ...55 7 2 LUBRICATION PLAN 5 8 6 10 6 7 13 4 2 1 11 3 9 12...
Page 61: ...61 BLANK...
Page 62: ...62 Operating instructions DINO 120T 120TB BLANK...
Page 64: ...64 Operating instructions DINO 120T 120TB NOTES...
Page 65: ...65 NOTES...