
8
Operating instructions
•
DINO 120T
•
120TB
1.1. OVERVIEW OF THE UNIT
This unit is a trailer mounted, towable aerial work platform.
It is an aerial work platform, which complies with the EN280 type 1, where travelling is only
allowed with the platform in transport configuration.
For the operation the lift shall be supported by its hydraulic outriggers, extended so that the
wheels of the trailer lift off the ground.
1.2. INTENDED USE OF THE WORK PLATFORM
The aerial work platform is exclusively intended for transferring people and tools and acting
as a work platform within its permissible load-bearing capacity and reach (refer to the
“Technical Specifications” table and the “Reach Diagram”).
The intended use also covers:
• Following all the instructions in the Operating Instructions
• Performance of the inspections and maintenance operations.
This aerial work platform is NOT insulated, and does not offer protection against contact with
electric current. The aerial work platform must not be used for work on electric systems.
Observe the safety instructions concerning the operating environment, and the restrictions
given in them,
DANGER
WARNING
CAUTION
NOTICE
The operator must receive instructions and consent from the manufacturer for all
such specific work methods or conditions that the manufacturer has not explicitly
defined in the unit's operation and maintenance instructions.
The primary power source of the lift is electric motor. The outriggers and the boom system
are hydraulically powered.
As an option, the lifts can be equipped with a driving device that can be controlled from the
ground.
Consult the chapters “Technical data" and “Structure and functions of the work platform" in
this manual for more detailed information about the lift.
Summary of Contents for DINO 120T
Page 2: ......
Page 6: ...6 Operating instructions DINO 120T 120TB BLANK...
Page 11: ...11 2 2 REACH DIAGRAM...
Page 45: ...45 BLANK...
Page 50: ...50 Operating instructions DINO 120T 120TB NOTES...
Page 51: ...51 NOTES...
Page 55: ...55 7 2 LUBRICATION PLAN 5 8 6 10 6 7 13 4 2 1 11 3 9 12...
Page 61: ...61 BLANK...
Page 62: ...62 Operating instructions DINO 120T 120TB BLANK...
Page 64: ...64 Operating instructions DINO 120T 120TB NOTES...
Page 65: ...65 NOTES...