INSTALLATION
4–25
If bottom cable entry is required, the cables must be routed through the UPS cabinet
bottom cable entry area (refer to Figure 2–2 or Figure 2–3). The cables must then be
routed to the UPS CSA Cabinet through the side openings between the UPS cabinet and
the UPS CSA Cabinet.
The side cable entry to the UPS cabinet and the UPS CSA Cabinet can be accommodated
through the right side of the UPS CSA Cabinet (Figure 4–16). The UPS CSA Cabinet is
provided with three cable trays to run the input, output, battery, and control cables to
the UPS cabinet.
FRONT
BACK
TOP
RIGHT SIDE VIEW OF
UPS CSA CABINET
REMOVABLE COVER
PLATE - SIDE CABLE
ENTRY AREA
420.12 mm
(16.54 in)
613.92 mm
(24.17 in)
231.14 mm
(9.10 in)
M K V - A 2 2 4 0 - 9 1
MOUNTING HOLES
(3 PLACES)
Figure 4–16
Right Side Cable Entry Area