1–10
INSTALLATION REFERENCE CHECKLISTS
1.4.2 Delivery/Handling
Digital Services responsibilities during delivery/handling are listed below.
Check Off
Function
Task
Site Delivery
Coordination
Assist the customer in assuring proper delivery and
placement of the HA3000 series cabinets.
Configuration
Assembly
Assist the customer in removing the appropriate side
skins and cover plates before the cabinets are in their
final position.
Final Assembly
Assist the customer in replacing all exterior skins.
Check to be sure that all cabinets are complete.
1.4.3 Initial Startup
Digital Services responsibilities during initial startup of the HA3000 series cabinets are
listed below.
Check Off
Function
Task
Prestartup Checks
Perform the checks before startup by referring to
Chapter 3 in the
HA3000 20-80 kVA Uninterruptible
Power System Technical Manual
(EK-HA32X-TM).
Option Checks
If the Remote Alarm Panel, the Smoke Detector, or the
DC Ground Fault Detector options are installed, verify
the wiring connections.
Initial Startup
Perform the initial startup procedure by referring to
Chapter 3 in the
HA3000 20-80 kVA Uninterruptible
Power System Technical Manual
(EK-HA32X-TM).
Initial Startup Tests
Perform the initial startup tests by referring to
Chapter 3 in the
HA3000 20-80 kVA Uninterruptible
Power System Technical Manual
(EK-HA32X-TM).
Option Verification
If the Remote Alarm Panel, the Smoke Detector, or the
DC Ground Fault Detector options are installed, verify
them for proper operation.
Operator Training
Demonstrate the operating modes and controls for the
customer’s operator.
Customer
Registration
Register the customer and give them the 1-800-525-
7104 number to call if a problem occurs.
Summary of Contents for HA3000