OPERATOR’S MANUAL
16 / CONTROLS
ISO
6
Version 4 Quick Start Guide
6011662 Rev B
8. Press the
SHAFT TURN
button to fill seed/fertilizer metering
system before starting calibration.
9. At the Calibration screen, enter the following values:
-
Density
- Enter product weight per volume in lbs/ft
3
.
-
Target Meter RPM
- Enter the RPM at which the output
meter shaft will turn during the calibration.
-
# of Meter Revs
- Enter number of total revolutions the
meter will turn during the calibration. This determines
the length of the test and is more accurate the higher
the number.
10. Place catch container to collect the dispensed material
to be weighed.
11. At the Calibration screen, press the
START
button.
12. Once calibration is complete, weigh and enter the lbs. of
material dispensed in the Amount Dispensed field.
13. Press the
SAVE
button.
The new spreader constant automatically calculates and is
entered for this material.