
42
DHOLLANDIA
•
Screw the extensions [# 4] in to shorten the tilt cylinders [# 1],
screw them out to lengthen the tilt cylinders [# 1].
•
Adjust the extensions [# 4] so that the center of their hole sits
5 to max. 10 mm longer / further than the corresponding holes
in the platform hands [# 5].
•
Do NOT unwind the extensions [# 4] further than the marker
groove shown above. If this is not possible, contact your
national DHOLLANDIA distributor for longer extensions [# 4].
•
After correct adjustment, fasten the locking nuts [# 3] firmly by
means of a C-spanner.
•
Secure the locking nuts [# 3] further by means of an M6 grub
screw [# 5] in the side flank of the locking nut.
•
Secure the M6 grub screw by means of a dot punch right
beside the orifice.
•
Put the rubber gaiter back in position and fasten its collar.
•
Operate OPEN / CLOSE to align the wholes in the adjustable extensions [# 4] with the holes in the platform hands.
•
Mount the pins of the tilt cylinders [# 1] and the rollers in the same way as originally supplied. See also 9 from page 36 onwards.
Fasten the bolts and nuts with the required torque.
WARNING
•
If extensions are unwound beyond the safe limits, this can cause the tilt cylinders to fail and the platform to fall down.
•
Negligence can put the operator and third parties at great risk and could result in severe personal injury or death.
•
Verify the effect of the tilt cylinder adjustment on the sealing rubbers (if applicable). Adjust the stroke of the tilt cylinders further if
needed.
•
If the platform is equipped with a platform lock, bolt or weld the fixed eye of the lock at the side of the vehicle body.
•
If the liftgate must comply with EN12642 on the Securing of Cargo, contact your national DHOLLANDIA distributor
prior to ordering the liftgate, to determine the required interfaces. See contact info on page 4.
Summary of Contents for DH-L 3300 lbs
Page 17: ...16 DHOLLANDIA LMS 55 66...
Page 28: ...27 DHOLLANDIA...
Page 49: ...48 DHOLLANDIA...
Page 52: ...51 DHOLLANDIA 11 3 1 Installation of 3 Button Wander Lead OAE002 E0784 M S...
Page 53: ...52 DHOLLANDIA 11 3 2 Installation of cabin cutoff switch OAE510 15 E0393 S 15...
Page 59: ...58 DHOLLANDIA EF0583 LM EN EF0565 EN EF0620 EN EF0580 EN CAP...
Page 60: ...59 DHOLLANDIA EF0585 US Serial Number EF0581 EN EF0563 EN EF0616 EF0562 EN...
Page 68: ...67 DHOLLANDIA...
Page 69: ...68 DHOLLANDIA...