background image

 

 

7

 

2.6.1 Masonry chimney 

This furnace can be vented into an existing masonry chimney. 
However, the unit must not be vented into a chimney into 
which a solid fuel burning furnace is already being vented. 

 

Before venting this furnace into a chimney, its condition must 
be checked and repairs made, if necessary. Also, the chimney 
lining and dimensions must conform to local and national 
codes. 

 

2.6.2  Factory Built Chimneys

 

Oil fired furnaces are approved for use with “L” type vents. The 
unit may also be used with an approved chimney of proper 
dimensions and temperature ratings as specified in the 
installation code. Refer to chimney manufacturer’s instructions 
for proper installation. 

2.6.3 Draft Regulator 

This unit may be installed with or without a draft regulator. 
However, it is recommended that a draft regulator be installed 
in cases where the draft is either high or variable due to 
external conditions. Follow the instructions provided with the 
regulator.

 

 

2.6.4 Side-wall Venting 

 

The heating unit is approved for side-wall venting. This system 
is comprised of a model VTK-098 / KLAVT0101DET side-wall 
venter and a 4” insulated vent pipe, model IFV098 / 
KLAFVxx01DET. Refer to the installation instructions provided 
with the venting system. 

2.7 BLOCKED

 

VENT

 

SHUT-OFF

 

DEVICE

 

(BVSO)

 

FOR

 

CHIMNEY

 

VENTING 

CAUTION 

It is imperative that this device be installed by a qualified service 
technician. 

 

A positive pressure venting system (Sealed Combustion System 
or Direct Vent) 

MUST NOT

 use the BVSO. Follow the 

instructions supplied with the venting system. 

 

This device is designed to detect the insufficient evacuation of 
combustion gases in the event of a vent blockage. In such a 
case the thermal switch will shut down the oil burner. The 
device will then need to be re-armed MANUALLY. 

 

Refer to the detailed instructions and wiring diagrams supplied 
with the BVSO for the installation and wiring procedures. The 
length of wires supplied with the unit is such that the safety 
device must be installed between the flue outlet of the 
appliance and the draft regulator, as indicated in the 
instructions. 

 

It is also essential that the BVSO be maintained annually. For 
more details refer to the instructions supplied with the device 
itself, as well as Section 3. of this Manual. 
 

2.7.1  BVSO Performance Test 

 

The purpose of the following test is to check that the electrical 
outlet on the furnace, designated to the BVSO, is functional. 

 

1.  Start up the burner; 
2.  Remove the three-pole plug from the BVSO outlet on 

the furnace; 

3.  The burner must shut-off immediately, while the 

blower continues to run to the end of the cool-down 
cycle. 

 

If the test is not in line with the above, call a QUALIFIED 
SERVICE TECHNICIAN. 
 

 

2.8 COMBUSTION

 

AIR

 

SUPPLY 

AND

 

VENTILATION 

 

WARNING

 

 

Poisonous carbon monoxide gas hazard. 

 

Comply with NFPA 31 (U.S.) and CSA B139 (Canada) 
standards for the installation of Oil Burning 
Equipment and applicable provisions of local building 
codes to provide combustion and ventilation air. 

 

Failure to provide adequate combustion and 
ventilation air can result in death, bodily injury and/or 
property damage. 

 

Oil furnaces must have an adequate supply of combustion 
air. It is common practice to assume that older homes 
have sufficient infiltration to accommodate the combustion 
air requirement for the furnace. However, home 
improvements such as new windows, doors, and weather 
stripping have drastically reduced the volume of air 
infiltration into the home.

 

 

Refer to oil furnace installation codes relative to 
combustion and ventilation air requirements. Consult 
Section 2.2 in this manual, specifically for units installed in 
an enclosed space.  

 

Home air exhausters are common. Bathroom and kitchen 
fans, power vented clothes dryers and water heaters all 
tend to create a negative pressure condition in the home. 
Should this occur the chimney becomes less and less 
effective and can easily downdraft. In certain cases, 
mechanically supplied air, by way of a blower, interlocked 
with the unit, is necessary. It is the installer’s responsibility 
to check that. 

2.8.1 

Contaminated Combustion Air  

Installations in certain areas or types of structures will 
increase the exposure to chemicals or halogens that may 
harm the furnace. These conditions will require that only 
outside air be used for combustion. 

 

The following areas or types of structures may contain or 
be exposed to certain substances, potentially requiring 
outside air for combustion: 

 

a. Commercial 

buildings; 

b.  Buildings with indoor pools; 
c. 

Furnaces installed near chemical storage areas. 

 

Exposure to the following substances: 
a.  Permanent wave chemicals for hair; 
b.  Chlorinated waxes and cleaners; 
c. 

Chlorine based swimming pool chemicals; 

d.  Water softening chemicals; 
e.  De-icing salts or chemicals; 
f. Carbon 

tetrachloride; 

Summary of Contents for AMP112SD

Page 1: ...L FOR THE INSTALLATION SERVICING OF THE FURNACE AND KEEP THE DOCUMENT NEAR THE UNIT FOR FUTURE REFERENCE HOMEOWNER PLEASE KEEP THIS MANUAL NEAR THE FURNACE FOR FUTURE REFERENCE Attention Do not tamper...

Page 2: ...tilation air openings in a closet door 4 Figure 2 Upflow installation 4 Figure 3 Downflow installation 5 Figure 4 Horizontal installation 5 Figure 5 Thermostat wiring heating and air conditioning with...

Page 3: ...formation such as the model and serial numbers of the furnace WARNING Installations and repairs performed by unqualified persons can result in hazards to them and to others Installations must conform...

Page 4: ...designed for outdoor installation It must be installed in such a manner as to protect its electrical components from water Outdoor installation will lead to a hazardous electrical condition and to pre...

Page 5: ...TION The exterior of the unit must have an uninterrupted ground to minimize the risk of bodily harm if ever an electrical problem develops A green ground screw is supplied with the control box for tha...

Page 6: ...Before starting the burner for the first time adjust the air and turbulator settings to those listed in this manual Once the burner becomes operational final adjustments will be required Refer to sect...

Page 7: ...ormance Test The purpose of the following test is to check that the electrical outlet on the furnace designated to the BVSO is functional 1 Start up the burner 2 Remove the three pole plug from the BV...

Page 8: ...distance 2 10 DUCTING WARNING Poisonous carbon monoxide gas hazard DO NOT draw return air from inside a closet or utility room Return air MUST be sealed to the furnace casing Failure to properly seal...

Page 9: ...o do so can result in death or bodily injury 2 13 1 Humidifier HUM The 120 VAC HUM terminal on the electronic board of the blower is tied directly to terminal 8 of the 9 terminal connector of the elec...

Page 10: ...n the instructions provided with the burner 3 3 CHECKS AND ADJUSTMENTS 3 3 1 Purging The Oil Line Open the bleed port screw and start the burner Allow the oil to drain into a container for at least 10...

Page 11: ...the obstruction and the burner should restart after a few minutes The time required for the restart also depends on the adjustment of the blower OFF delay 3 3 9 Restart After Burner Failure 1 Set the...

Page 12: ...obstruction inside the heat transfer tube 7 Re mount lock and fasten the control box with the 2 screws removed in step 4 8 Re attach the assembly cover with the screws removed in step 2 9 Re establish...

Page 13: ...vice telephone Day Night Dealer name and address START UP RESULTS Nozzle Pressure lb po 2 Burner adjustments Primary air Fine air Drawer Assembly CO2 Smoke scale Bacharach Gross stack temperature F Am...

Page 14: ...ard and Canadian regulation 85 5 85 0 85 5 85 0 AFUE From ASHRAE 103 standard and US regulation 85 2 85 0 85 2 85 0 Volts Hertz Phase Rated current Amps Minimum ampacity for wire sizing Amps Max fuse...

Page 15: ...nOn D elay CFMLevel Time ShortR unOn Delay C FMLevel Time Off Delay CFMLevel Time A 1 OFF 2 OFF 0 68 13 45sec 19 60sec 38 3min B 1 ON 2 OFF 0 80 13 45sec 19 30sec 38 3min C 1 OFF 2 ON A ll 13 45sec 10...

Page 16: ...ANDWARM AIRDUCTWITHIN6ft OFFURNACE1 5 08 cm 2 2 54cm 1 5 08 cm 2 BOTTOM FURNACE2 2 54cm 1 3 5 08 cm 2 4 BACK FURNACE OP P OSITESIDEOFTHEBURNE R 1 7 62 cm 3 7 62cm 3 7 62 cm 3 PLE NUMORHORIZONTALWARM A...

Page 17: ...17 Figure 9 Furnace Dimensions...

Page 18: ...18 Figure 10 Wiring Diagram 4 Speed Motor PSC...

Page 19: ...19 Figure 11 Wiring Diagram Variable Speed Motor ECM...

Page 20: ...20 Figure 12 Parts list with 4 speed motor PSC B50091C...

Page 21: ...er slide included 32 B03637 02 LATERAL BAFFLE 33 B03480 01 FILTER RACK KIT 34 B03635 FLOOR 35 B03651 02 SIDE PANEL ASSEMBLY LEFT Panel insulation and baffle included 36 B03653 REAR PANEL ASSEMBLY Pane...

Page 22: ...22 Figure 13 Parts list with variable speed motor ECM B50092C...

Page 23: ...IDE One blower slide included 31 B03637 02 LATERAL BAFFLE 32 B03480 01 FILTER RACK KIT 33 B03635 FLOOR 34 B03651 02 SIDE PANEL ASSEMBLY LEFT Panel insulation and baffle included 35 B03653 REAR PANEL A...

Page 24: ...DER LE DOCUMENT PR S DE L UNIT POUR R F RENCES ULT RIEURES PROPRI TAIRE S V P GARDER CE MANUEL PR S DE L UNIT POUR R F RENCES ULT RIEURES Attention Ne pas alt rer votre unit ou ses contr les Appeler u...

Page 25: ......

Page 26: ...ions et localisation ouvertures de ventilation dans la porte du placard 6 Figure 2 D bit ascendant 6 Figure 3 D bit descendant 6 Figure 4 D bit horizontal 6 Figure 5 Branchement du thermostat chauffag...

Page 27: ...v Le filtre air comment le changer v rifier mensuellement et nettoyer ou changer si n cessaire g Avant d appeler pour le service ayez en main la page de la fiche technique section 5 note de ce manuel...

Page 28: ...s de chauffage air chaud et syst me d air climatis ANSI NFPA 211 Chemin e Foyers vents et appareils de chauffage ANSI NFPA 70 Code National d lectricit CSA C22 1 or CSA C22 10 Code Canadien d lectrici...

Page 29: ...tre install dans le m me sens peu importe l orientation de la fournaise Voir figure 3 pour plus de d tails La plaque de protection B03789 doit tre install e sur le couvercle de plastique du br leur B...

Page 30: ...chauffage central utilisez seulement du fil de cuivre r sistant la m me temp rature que les fils d origine 2 4 INSTALLATION DU THERMOSTAT L installation d un thermostat de contr le de la temp rature d...

Page 31: ...u br leur pour plus de d tail concernant l ajustement du d lai post purge 2 6 VACUATION MISE EN GARDE Risque d empoisonnement par monoxyde de carbone Lire et suivre toutes les instructions contenues d...

Page 32: ...UALIFI 2 8 APPROVISIONNEMENT EN AIR DE COMBUSTION ET VENTILATION MISE EN GARDE Risque d empoisonnement par monoxyde de carbone R f rer aux codes d installation des appareils au mazout ANSI NFPA 31 aux...

Page 33: ...tallations ayant un r servoir de mazout situ sous le niveau du br leur doivent utiliser une ligne de retour de mazout vers le r servoir avec une pompe appropri e une l vation de 2 4 m 8 et plus requi...

Page 34: ...auffage Position interrupteurs DIP 1 2 POSITION Consommation USGPH OFF OFF A 0 68 ON OFF B 0 80 OFF ON C 0 68 ON ON D 0 80 Ajustements suppl mentaires pour une l vation de temp rature de l air sup rie...

Page 35: ...huile est ouverte 5 Le bouton Reset du br leur est bien enfoncer ou r armer 6 L ajustement d air pr liminaire du br leur est conforme aux tableaux des sp cifications de ce manuel 7 L ajustement des v...

Page 36: ...evant du r gulateur la verticale voir les instructions incluses avec le r gulateur Ajuster le r gulateur de tirage apr s que l appareil ait fonctionn e au moins cinq minutes et r gl entre 0 025 et 0 0...

Page 37: ...les fusibles et disjoncteur 3 V rifier si l interrupteur d alimentation principal de la fournaise est en position ON 4 Ajuster le thermostat au dessus de la temp rature ambiante 5 Si l allumage du br...

Page 38: ...tre du r servoir Remplacer le filtre du r servoir au besoin Suivre les instructions du fabriquant Filtre secondaire Remplacer les cartouches des filtres de 10 microns ou moins une fois par ann e Suivr...

Page 39: ...103 et des lois am ricaines 85 2 85 0 85 2 85 0 BR LEUR RIELLO MOD LE 40 BF5 vacuation directe DV Longueur d insertion du tube du br leur pouces Gicleur Delavan 0 60 70A 0 70 70A 0 60 70A 0 70 70A Pr...

Page 40: ...On Niveau PCM Temps D lai Off Niveau PCM Temps A 1 OFF 2 OFF 0 68 13 45 sec 19 60 sec 38 3 min B 1 ON 2 OFF 0 80 13 45 sec 19 30 sec 38 3 min C 1 OFF 2 ON Tous 13 45 sec 100 0 sec 100 2 min D 1 ON 2 O...

Page 41: ...ISE 1 5 08 cm 2 2 54 cm 1 5 08 cm 2 DESSOUS FOURNAISE 2 2 54 cm 1 3 5 08cm 2 4 ARRI RE FOURNAISE C T OPPOS DUBR LEUR 1 7 62 cm 3 7 62 cm 3 7 62 cm 3 PL NUMOU CONDUIT D AIR CHAUDHORIZONTAL 6 pi DE LA F...

Page 42: ...19 Figure 9 Dimensions de la fournaise...

Page 43: ...20 Figure 10 Diagramme lectrique avec moteur 4 vitesses PSC...

Page 44: ...21 Figure 11 Diagramme lectrique avec moteur vitesse variable ECM...

Page 45: ...22 B50091C Figure 12 Liste de pi ces avec moteur 4 vitesses PSC...

Page 46: ...une seule glissi re 32 B03637 02 DEFLECTEUR LATERAL 33 B03480 01 KIT SUPPORT A FILTRE 34 B03635 PLANCHER 35 B03651 02 ASS PANNEAU COTE GAUCHE Comprend panneau isolation et d flecteur 36 B03653 ASS PA...

Page 47: ...24 B50092C Figure 13 Liste de pi ces avec moteur vitesse variable ECM...

Page 48: ...TEUR Comprend une seule glissi re 31 B03637 02 DEFLECTEUR LATERAL 32 B03480 01 KIT SUPPORT A FILTRE 33 B03635 PLANCHER 34 B03651 02 ASS PANNEAU COTE GAUCHE Comprend panneau isolation et d flecteur 35...

Reviews: