2
TABLE OF CONTENTS
1
SAFETY REGULATIONS.................................... 3
1.1
SAFETY LABELING AND WARNING SIGNS..... 3
1.2 IMPORTANT
INFORMATION............................... 3
1.3 DETECTION
SYSTEMS ......................................... 3
1.4 DANGER
OF
FREEZING........................................ 3
2
INSTALLATION ................................................... 4
2.1
POSITIONING THE FURNACE ............................. 4
2.2 CONFIGURATIONS................................................ 4
2.3
ELECTRICAL SYSTEM ......................................... 5
2.4
INSTALLATION OF THE THERMOSTAT ........... 5
2.5 INSTALLATION
OF THE BURNER...................... 6
2.6 VENTING................................................................. 6
2.7
BLOCKED VENT SHUT-OFF DEVICE (BVSO)
FOR
CHIMNEY
VENTING..................................... 7
2.8
COMBUSTION AIR SUPPLY AND
VENTILATION........................................................ 7
2.10 DUCTING ................................................................ 8
2.11
SUPPLY AIR ADJUSTMENTS (4 SPEED
MOTORS) ................................................................ 8
2.12
SUPPLY AIR ADJUSTMENTS (ECM VARIABLE
SPEED
MOTORS) ................................................... 9
2.13
INSTALLATION OF ACCESSORIES .................... 9
3
OPERATION........................................................ 10
3.1 START-UP ............................................................. 10
3.2
OPERATING SEQUENCE OIL HEATING MODE .
................................................................................ 10
3.3 CHECKS
AND
ADJUSTMENTS .......................... 10
4
MAINTENANCE ................................................. 11
4.1
CLEANING THE HEAT EXCHANGER .............. 11
4.2
CLEANING THE BLOCKED VENT SHUT-OFF
DEVICE
(BVSO).................................................... 12
4.3 CHANGING
OF
THE
BURNER
HEAD................ 12
4.4 CHANGING
THE NOZZLE .................................. 12
4.5 CHANGING
THE
OIL FILTER ............................ 12
4.6 CHANGING
THE
AIR FILTER ............................ 12
5
FURNACE INFORMATION.............................. 13
FIGURES
Figure 1: Location and dimensions of ventilation air
openings in a closet door...........................................4
Figure 2: Upflow installation ............................................4
Figure 3: Downflow installation .......................................5
Figure 4: Horizontal installation .......................................5
Figure 5: Thermostat wiring, heating and air conditioning
with 4 speed motor....................................................5
Figure 6: Thermostat wiring, heating and air conditioning
with ECM variable speed motor ...............................6
Figure 7: Thermostat wiring, heating and air
conditioning/heat pump with ECM variable speed
motor .........................................................................6
Figure 8: Blower start/stop delays, board #1158 ..............9
Figure 9: Furnace dimensions .........................................17
Figure 10: Wiring diagram 4 speed motor (PSC) ...........18
Figure 11: Wiring diagram variable speed motor (ECM)
................................................................................19
Figure 12: Parts list with 4 speed motor (PSC)...............20
Figure 13: Parts list with variable speed motor (ECM) ..22
TABLES
Table 1: Blower speed adjustments, 4 speed motor ..........8
Table 2: Air adjustments, heating mode ...........................9
Table 3: Airflow adjustments, air conditioning mode ......9
Table 4: Airflow adjustments, all modes ..........................9
Table 5: Delay adjustments, heating mode .......................9
Table 6: Technical specifications....................................14
Table 7: Airflow data, with 1/2 HP, ECM motors .........15
Table 8: Airflow data model with 1/2 HP 4 speed motor16
Table 9: Min. clearances from combustible material ......16
Table 10: Parts list with 4 speed motor (PSC) ................21
Table 11: Parts list with variable speed motor (ECM)....23
Summary of Contents for AMP112SD
Page 17: ...17 Figure 9 Furnace Dimensions...
Page 18: ...18 Figure 10 Wiring Diagram 4 Speed Motor PSC...
Page 19: ...19 Figure 11 Wiring Diagram Variable Speed Motor ECM...
Page 20: ...20 Figure 12 Parts list with 4 speed motor PSC B50091C...
Page 22: ...22 Figure 13 Parts list with variable speed motor ECM B50092C...
Page 25: ......
Page 42: ...19 Figure 9 Dimensions de la fournaise...
Page 43: ...20 Figure 10 Diagramme lectrique avec moteur 4 vitesses PSC...
Page 44: ...21 Figure 11 Diagramme lectrique avec moteur vitesse variable ECM...
Page 45: ...22 B50091C Figure 12 Liste de pi ces avec moteur 4 vitesses PSC...
Page 47: ...24 B50092C Figure 13 Liste de pi ces avec moteur vitesse variable ECM...