2.2.2 Downflow Installation 

When the furnace is installed in the downflow position on a 
combustible floor, the clearances from combustibles must 
be adhered to. The downflow base DFB-103 or 
KLASB0901DET can be used to ensure these clearances. 
Refer to Figure 3 and the installation instructions provided 
with the base. 

 

The burner must always be installed in the same manner, 
regardless of the discharge position of the furnace. Refer 
to Figure 3 for additional details. 
 
The protection plate (B03789) must be installed on the 
plastic cover of the Beckett NX burner to protect it from 
vent. 

Figure 3: Downflow installation

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

2.2.3 Horizontal 

Installation 

 

When the furnace is installed in the horizontal position, 
either suspended or on a combustible floor with a choice of 
right or left discharge, the clearances from combustible 
material must be adhered to. If the unit is installed on a 
combustible floor, the horizontal floor base HFB-101 or 
KLASB0701DET can be used to ensure these clearances. 
Refer to the instructions supplied with the base. 

 

The burner must always be installed in the same manner, 
regardless of the discharge position of the furnace. Refer 
to Figure 4 for additional details. 
 

Figure 4: Horizontal installation

 

 

2.3 ELECTRICAL 

SYSTEM 

CAUTION 

The exterior of the unit must have an uninterrupted 
ground to minimize the risk of bodily harm, if ever an 
electrical problem develops. A green ground screw is 
supplied with the control box for that purpose.

  

 

The appliance must be installed in accordance with the 
current ANSI/NFPA 70 National Electrical Code, CSA 
C22.1 Canadian Electrical Code Part 1 and/or local 
codes. 

 

The control system depends on the correct polarity of 
the power supply. Connect “HOT” wire (H) and 
“NEUTRAL” wire (N) as shown in Figures 10 and 11. 

 

A separate line voltage supply should be used, with 
fused disconnect switch or circuit breaker, between the 
main power panel and the unit. 

 

Only copper wire may be used for the 115V circuit on 
this unit. If wires need to be changed, the replacements 
must have the same temperature resistance as the 
originals. 

2.4 INSTALLATION

 

OF

 

THE

 

THERMOSTAT 

A thermostat must be installed to control the 
temperature of the area to be heated. Follow the 
instructions supplied with the thermostat. Also refer to 
the wiring diagrams provided with the heating/air 
conditioning unit. The connections must be made as 
indicated on the following diagrams and the wiring 
diagrams, Figures 10 and 11. 

Figure 5: Thermostat wiring, heating and air 

conditioning with 4 speed motor

 

 

 

Filter 20 x 24 

Downflow base is 
required for 
combustible floor 

Burner position 

DNS-1227A 

Horizontal floor base required 
for combustible floor 

Burner position 

Filter 20 x 24 

DNS-1227A 

Summary of Contents for AMP112SD

Page 1: ...L FOR THE INSTALLATION SERVICING OF THE FURNACE AND KEEP THE DOCUMENT NEAR THE UNIT FOR FUTURE REFERENCE HOMEOWNER PLEASE KEEP THIS MANUAL NEAR THE FURNACE FOR FUTURE REFERENCE Attention Do not tamper...

Page 2: ...tilation air openings in a closet door 4 Figure 2 Upflow installation 4 Figure 3 Downflow installation 5 Figure 4 Horizontal installation 5 Figure 5 Thermostat wiring heating and air conditioning with...

Page 3: ...formation such as the model and serial numbers of the furnace WARNING Installations and repairs performed by unqualified persons can result in hazards to them and to others Installations must conform...

Page 4: ...designed for outdoor installation It must be installed in such a manner as to protect its electrical components from water Outdoor installation will lead to a hazardous electrical condition and to pre...

Page 5: ...TION The exterior of the unit must have an uninterrupted ground to minimize the risk of bodily harm if ever an electrical problem develops A green ground screw is supplied with the control box for tha...

Page 6: ...Before starting the burner for the first time adjust the air and turbulator settings to those listed in this manual Once the burner becomes operational final adjustments will be required Refer to sect...

Page 7: ...ormance Test The purpose of the following test is to check that the electrical outlet on the furnace designated to the BVSO is functional 1 Start up the burner 2 Remove the three pole plug from the BV...

Page 8: ...distance 2 10 DUCTING WARNING Poisonous carbon monoxide gas hazard DO NOT draw return air from inside a closet or utility room Return air MUST be sealed to the furnace casing Failure to properly seal...

Page 9: ...o do so can result in death or bodily injury 2 13 1 Humidifier HUM The 120 VAC HUM terminal on the electronic board of the blower is tied directly to terminal 8 of the 9 terminal connector of the elec...

Page 10: ...n the instructions provided with the burner 3 3 CHECKS AND ADJUSTMENTS 3 3 1 Purging The Oil Line Open the bleed port screw and start the burner Allow the oil to drain into a container for at least 10...

Page 11: ...the obstruction and the burner should restart after a few minutes The time required for the restart also depends on the adjustment of the blower OFF delay 3 3 9 Restart After Burner Failure 1 Set the...

Page 12: ...obstruction inside the heat transfer tube 7 Re mount lock and fasten the control box with the 2 screws removed in step 4 8 Re attach the assembly cover with the screws removed in step 2 9 Re establish...

Page 13: ...vice telephone Day Night Dealer name and address START UP RESULTS Nozzle Pressure lb po 2 Burner adjustments Primary air Fine air Drawer Assembly CO2 Smoke scale Bacharach Gross stack temperature F Am...

Page 14: ...ard and Canadian regulation 85 5 85 0 85 5 85 0 AFUE From ASHRAE 103 standard and US regulation 85 2 85 0 85 2 85 0 Volts Hertz Phase Rated current Amps Minimum ampacity for wire sizing Amps Max fuse...

Page 15: ...nOn D elay CFMLevel Time ShortR unOn Delay C FMLevel Time Off Delay CFMLevel Time A 1 OFF 2 OFF 0 68 13 45sec 19 60sec 38 3min B 1 ON 2 OFF 0 80 13 45sec 19 30sec 38 3min C 1 OFF 2 ON A ll 13 45sec 10...

Page 16: ...ANDWARM AIRDUCTWITHIN6ft OFFURNACE1 5 08 cm 2 2 54cm 1 5 08 cm 2 BOTTOM FURNACE2 2 54cm 1 3 5 08 cm 2 4 BACK FURNACE OP P OSITESIDEOFTHEBURNE R 1 7 62 cm 3 7 62cm 3 7 62 cm 3 PLE NUMORHORIZONTALWARM A...

Page 17: ...17 Figure 9 Furnace Dimensions...

Page 18: ...18 Figure 10 Wiring Diagram 4 Speed Motor PSC...

Page 19: ...19 Figure 11 Wiring Diagram Variable Speed Motor ECM...

Page 20: ...20 Figure 12 Parts list with 4 speed motor PSC B50091C...

Page 21: ...er slide included 32 B03637 02 LATERAL BAFFLE 33 B03480 01 FILTER RACK KIT 34 B03635 FLOOR 35 B03651 02 SIDE PANEL ASSEMBLY LEFT Panel insulation and baffle included 36 B03653 REAR PANEL ASSEMBLY Pane...

Page 22: ...22 Figure 13 Parts list with variable speed motor ECM B50092C...

Page 23: ...IDE One blower slide included 31 B03637 02 LATERAL BAFFLE 32 B03480 01 FILTER RACK KIT 33 B03635 FLOOR 34 B03651 02 SIDE PANEL ASSEMBLY LEFT Panel insulation and baffle included 35 B03653 REAR PANEL A...

Page 24: ...DER LE DOCUMENT PR S DE L UNIT POUR R F RENCES ULT RIEURES PROPRI TAIRE S V P GARDER CE MANUEL PR S DE L UNIT POUR R F RENCES ULT RIEURES Attention Ne pas alt rer votre unit ou ses contr les Appeler u...

Page 25: ......

Page 26: ...ions et localisation ouvertures de ventilation dans la porte du placard 6 Figure 2 D bit ascendant 6 Figure 3 D bit descendant 6 Figure 4 D bit horizontal 6 Figure 5 Branchement du thermostat chauffag...

Page 27: ...v Le filtre air comment le changer v rifier mensuellement et nettoyer ou changer si n cessaire g Avant d appeler pour le service ayez en main la page de la fiche technique section 5 note de ce manuel...

Page 28: ...s de chauffage air chaud et syst me d air climatis ANSI NFPA 211 Chemin e Foyers vents et appareils de chauffage ANSI NFPA 70 Code National d lectricit CSA C22 1 or CSA C22 10 Code Canadien d lectrici...

Page 29: ...tre install dans le m me sens peu importe l orientation de la fournaise Voir figure 3 pour plus de d tails La plaque de protection B03789 doit tre install e sur le couvercle de plastique du br leur B...

Page 30: ...chauffage central utilisez seulement du fil de cuivre r sistant la m me temp rature que les fils d origine 2 4 INSTALLATION DU THERMOSTAT L installation d un thermostat de contr le de la temp rature d...

Page 31: ...u br leur pour plus de d tail concernant l ajustement du d lai post purge 2 6 VACUATION MISE EN GARDE Risque d empoisonnement par monoxyde de carbone Lire et suivre toutes les instructions contenues d...

Page 32: ...UALIFI 2 8 APPROVISIONNEMENT EN AIR DE COMBUSTION ET VENTILATION MISE EN GARDE Risque d empoisonnement par monoxyde de carbone R f rer aux codes d installation des appareils au mazout ANSI NFPA 31 aux...

Page 33: ...tallations ayant un r servoir de mazout situ sous le niveau du br leur doivent utiliser une ligne de retour de mazout vers le r servoir avec une pompe appropri e une l vation de 2 4 m 8 et plus requi...

Page 34: ...auffage Position interrupteurs DIP 1 2 POSITION Consommation USGPH OFF OFF A 0 68 ON OFF B 0 80 OFF ON C 0 68 ON ON D 0 80 Ajustements suppl mentaires pour une l vation de temp rature de l air sup rie...

Page 35: ...huile est ouverte 5 Le bouton Reset du br leur est bien enfoncer ou r armer 6 L ajustement d air pr liminaire du br leur est conforme aux tableaux des sp cifications de ce manuel 7 L ajustement des v...

Page 36: ...evant du r gulateur la verticale voir les instructions incluses avec le r gulateur Ajuster le r gulateur de tirage apr s que l appareil ait fonctionn e au moins cinq minutes et r gl entre 0 025 et 0 0...

Page 37: ...les fusibles et disjoncteur 3 V rifier si l interrupteur d alimentation principal de la fournaise est en position ON 4 Ajuster le thermostat au dessus de la temp rature ambiante 5 Si l allumage du br...

Page 38: ...tre du r servoir Remplacer le filtre du r servoir au besoin Suivre les instructions du fabriquant Filtre secondaire Remplacer les cartouches des filtres de 10 microns ou moins une fois par ann e Suivr...

Page 39: ...103 et des lois am ricaines 85 2 85 0 85 2 85 0 BR LEUR RIELLO MOD LE 40 BF5 vacuation directe DV Longueur d insertion du tube du br leur pouces Gicleur Delavan 0 60 70A 0 70 70A 0 60 70A 0 70 70A Pr...

Page 40: ...On Niveau PCM Temps D lai Off Niveau PCM Temps A 1 OFF 2 OFF 0 68 13 45 sec 19 60 sec 38 3 min B 1 ON 2 OFF 0 80 13 45 sec 19 30 sec 38 3 min C 1 OFF 2 ON Tous 13 45 sec 100 0 sec 100 2 min D 1 ON 2 O...

Page 41: ...ISE 1 5 08 cm 2 2 54 cm 1 5 08 cm 2 DESSOUS FOURNAISE 2 2 54 cm 1 3 5 08cm 2 4 ARRI RE FOURNAISE C T OPPOS DUBR LEUR 1 7 62 cm 3 7 62 cm 3 7 62 cm 3 PL NUMOU CONDUIT D AIR CHAUDHORIZONTAL 6 pi DE LA F...

Page 42: ...19 Figure 9 Dimensions de la fournaise...

Page 43: ...20 Figure 10 Diagramme lectrique avec moteur 4 vitesses PSC...

Page 44: ...21 Figure 11 Diagramme lectrique avec moteur vitesse variable ECM...

Page 45: ...22 B50091C Figure 12 Liste de pi ces avec moteur 4 vitesses PSC...

Page 46: ...une seule glissi re 32 B03637 02 DEFLECTEUR LATERAL 33 B03480 01 KIT SUPPORT A FILTRE 34 B03635 PLANCHER 35 B03651 02 ASS PANNEAU COTE GAUCHE Comprend panneau isolation et d flecteur 36 B03653 ASS PA...

Page 47: ...24 B50092C Figure 13 Liste de pi ces avec moteur vitesse variable ECM...

Page 48: ...TEUR Comprend une seule glissi re 31 B03637 02 DEFLECTEUR LATERAL 32 B03480 01 KIT SUPPORT A FILTRE 33 B03635 PLANCHER 34 B03651 02 ASS PANNEAU COTE GAUCHE Comprend panneau isolation et d flecteur 35...

Reviews: