34
Two-Post Rack Installation
3
Remove the bracket and then place the bracket on either the 7.62-cm or 15.24-cm (3-inch or 6-inch)
wide flush-mount threaded studs (see Figure 2-5).
4
Using the two nuts that you removed in step 2, tighten the nuts finger tight to secure the adjustable
mounting bracket (see Figure 2-5).
5
Repeat step 2 through step 4 to configure the other mounting rail.
Figure 2-5.
Configuring the Adjustable Mounting Bracket for Flush-Mount Installation
6
Holding the left mounting rail at the location you marked, position the flush-mount mounting flange
against the front of the vertical two-post rack and secure it to the two-post rail with two 12-24 x
0.5-inch pan-head Phillips screws (see Figure 2-6).
1
nuts (2 per bracket)
2
adjustable mounting bracket
3
7.62-cm (3-inch) wide, flush-
mount, threaded studs
4
flush-mount mounting flange
1
4
3
2
Summary of Contents for PowerEdge 1950
Page 2: ......
Page 3: ...w w w d e l l c o m s u p p o r t d e l l c o m Rack Installation Guide ...
Page 28: ...26 Four Post Rack Installation ...
Page 40: ...38 Two Post Rack Installation ...
Page 42: ...40 Index 40 Index ...
Page 43: ...w w w d e l l c o m s u p p o r t d e l l c o m Guide d installation du rack ...
Page 80: ...78 Installation dans un rack à deux montants ...
Page 83: ...w w w d e l l c o m s u p p o r t d e l l c o m Rack Installationsanleitung ...
Page 123: ...w w w d e l l c o m s u p p o r t d e l l c o m ラック取り付けガイド ...
Page 134: ...132 4 柱型ラックの取り付け 図 1 4 垂直レールの印付け 1 垂直レールの印 2 1 ...
Page 160: ...158 2 柱型ラックの取り付け ...
Page 163: ...w w w d e l l c o m s u p p o r t d e l l c o m Guía de instalación del rack ...