![Dell 1081AD User Manual Download Page 29](http://html.mh-extra.com/html/dell/1081ad/1081ad_user-manual_85960029.webp)
Installation
xxx
|
xxx
21
3
(Optional) Assemble the blanking panel to the rails on the front side of the
rack and tighten the thumbscrews (item 3).
To remove the switch from the rack:
1
Unscrew the thumbscrews and pull the switch assembly out of the rack until
the travel stops are reached. The travel stop position is intended to provide
the opportunity to reposition the rail grip; it is not intended for service.
2
Locate the blue tabs on the sides of the switch rails (item 4).
3
Push the tabs inward and continue pulling the assembly until the switch
rails are clear of the ReadyRails assemblies.
1U Front-rack Installation
Before installation, the rails that are attached to the switch must be re-
configured.
1
On each switch rail, lift the tab under the front standoff and slide the rail
forward as you lift the rail from the switch (Figure 2.6, item 1).
Summary of Contents for 1081AD
Page 1: ...Dell Server Console Switch User s Guide ...
Page 18: ...10xxx Product Overviewxxx ...
Page 32: ...24xxx Installationxxx Figure 2 8 Basic SCS Configuration ...
Page 38: ...30xxx Installationxxx Figure 2 10 Tiering the SCS With a UTP Analog Switch ...
Page 40: ...32xxx Installationxxx Figure 2 11 Tiering Legacy Switches ...
Page 46: ...38xxx Installationxxx ...
Page 88: ...80xxx OBWI Operationxxx ...
Page 112: ...104xxx Video Viewerxxx ...
Page 116: ...108xxx Terminal Operationxxx ...
Page 122: ...Appendix B Setup Port Pinoutsxxx xxx114 ...
Page 134: ...Appendix E UTP Cablingxxx xxx126 ...