
16
xxx
|
Installation
xxx
Figure 2.1: 1U Tool-less Configuration
2
Align and seat the front flange pegs in the holes on the front side of the
vertical post (item 2).
3
Repeat this procedure for the second rail.
4
To remove each rail, pull on the latch release button on each flange ear
(item 3) and unseat each rail.
Two-Post Flush-Mount Configuration
1
For this configuration, the castings must be removed from the front side of
each ReadyRails assembly (Figure 2.2, item 1). Use a Torx™ driver to
remove the two screws from each front flange ear (on the switch side of the
rail) and remove each casting. Retain castings for future rack requirements.
It is not necessary to remove the rear flange castings.
Summary of Contents for 1081AD
Page 1: ...Dell Server Console Switch User s Guide ...
Page 18: ...10xxx Product Overviewxxx ...
Page 32: ...24xxx Installationxxx Figure 2 8 Basic SCS Configuration ...
Page 38: ...30xxx Installationxxx Figure 2 10 Tiering the SCS With a UTP Analog Switch ...
Page 40: ...32xxx Installationxxx Figure 2 11 Tiering Legacy Switches ...
Page 46: ...38xxx Installationxxx ...
Page 88: ...80xxx OBWI Operationxxx ...
Page 112: ...104xxx Video Viewerxxx ...
Page 116: ...108xxx Terminal Operationxxx ...
Page 122: ...Appendix B Setup Port Pinoutsxxx xxx114 ...
Page 134: ...Appendix E UTP Cablingxxx xxx126 ...