
18
xxx
|
Installation
xxx
Two-post Center-mount Configuration
1
Slide the plunger bracket rearward until it clicks into place and secure the
bracket to the front post flange with two user-supplied screws (Figure 2.3,
item 1).
Figure 2.3: Two-post Center-mount Configuration
2
Slide the back bracket towards the post and secure it to the post flange with
two user-supplied screws (item 2).
3
Repeat this procedure for the second rail.
Four-post Threaded Configuration
1
For this configuration, the flange ear castings must be removed from each
end of the ReadyRails assemblies. Use a Torx™ driver to remove the two
Summary of Contents for 1081AD
Page 1: ...Dell Server Console Switch User s Guide ...
Page 18: ...10xxx Product Overviewxxx ...
Page 32: ...24xxx Installationxxx Figure 2 8 Basic SCS Configuration ...
Page 38: ...30xxx Installationxxx Figure 2 10 Tiering the SCS With a UTP Analog Switch ...
Page 40: ...32xxx Installationxxx Figure 2 11 Tiering Legacy Switches ...
Page 46: ...38xxx Installationxxx ...
Page 88: ...80xxx OBWI Operationxxx ...
Page 112: ...104xxx Video Viewerxxx ...
Page 116: ...108xxx Terminal Operationxxx ...
Page 122: ...Appendix B Setup Port Pinoutsxxx xxx114 ...
Page 134: ...Appendix E UTP Cablingxxx xxx126 ...