
3. The first time the boiler is powered up, the
LANGUAGE
menu is
displayed. Select the desired language by turning the rotary
button.
4. To confirm, press the rotary button.
The boiler will begin an automatic venting-programme (which lasts
approx. 3 minutes) and will do this every time the power supply is
isolated.
Error during the start-up procedure:
4
No information is shown on the display:
-
Check the mains supply voltage
-
Check the fuses
-
Check the connection of the power cable to the connector X1
on the PCU PCB
4
If there is a problem, the error is displayed on the screen.
¼
See chapter: "Messages (Code type Bxx or Mxx)", page
5.4
Gas settings
5.4.1.
Adapting to another gas type
WARNING
Only a qualified engineer may carry out the following
operations.
The boiler is preset in the factory to operate on natural gas H (G20).
For operation on another group of gases, carry out the following
operations:
4
Set the fan speed using the parameters
MIN.VENT.
,
MAX.VENT.BOIL
,
MAX.VENT.DHW
and
START SP.
:
¼
See chapter: "Professional settings", page 84
4
Set the air/gas ratio.
¼
"Setting the air/gas ratio (Full load)", page 71
¼
"Setting the air/gas ratio (Part load)", page 72
4
Affix the label which indicates for which type of gas the boiler is
fitted and set.
Français - Deutsch - English -
Italiano - Espanol - Nederlands
- Pycck - Polski - Türk -
bar
1
1
2
2
r
c
STD
(
'
t
v
0
2
4
6
8
10
12
14
16
18
22
24
20
p
b
x c
r
g
m
ÿ
LANGUE
FRANCAIS
C002286-C
L000182-A
XXXXXXXXXXXX
XXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXX
XXXXXXXXXX
XXXXXXXXXXXX
XXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXX
XXXXXXXX
1
5. Commissioning
AGC 10/15 - AGC 15 - AGC 25 - AGC 35
70
20/01/2012 - 300026081-001-B