
4.7.1.
Classification
4
2
6
2
2
1
5
3
12
12
12
L
1
L
1
Lmax = L
1
+L
2
Lmax =
L
1
+L
2
Lmax
Lmax
Lmax
Lmax
max
max
max
1m
1m
1m
Lmax
L
2
L
2
Lmax
Lmax
C33
C93
B23
C93
C33
C33
C13
C53
C43
C43
C43
C003087-A
1
Configuration C
13
Air/flue gas connection by means of concentric pipes to a
horizontal terminal (so-called forced flue)
2
Configuration C
33
Air/flue gas connection by means of concentric pipes to a
vertical terminal (roof outlet)
3
Configuration C
93
Air/flue gas connection by concentric pipes in the boiler
room and single pipes in the chimney (combustive air in
counter current in the chimney)
4
Configuration C
93
Air/flue gas connection by concentric pipes in the boiler
room and single flex in the chimney (combustive air in
counter current in the chimney)
WARNING
4
Only factory components are authorised for
connecting the boiler and the terminal.
4
The clear section must comply with the
standard.
4
The chimney must be swept before the
installation of the evacuation conduit.
4. Installation
AGC 10/15 - AGC 15 - AGC 25 - AGC 35
34
20/01/2012 - 300026081-001-B