
4.9.12.
Connection in cascade
n
DHW tank after the mixing tank
A
Master boiler
Z
Secondary boiler
E
Secondary boiler
R
D.H.W. load pump
T
Connect the DHW sensor (Package AD212)
Y
Cable
BUS
U
Low loss header
I
Cascade outlet sensor
Connect the sensor to the terminal block
S SYST
on the
master boiler.
Settings to be made for this type of installation: Master boiler
Parameters
Access
Settings to be made See chapter
INSTALLATION
Installer level
#SYSTEM
menu
EXTENDED
¼
"Displaying the parameters in extended
P.DHW:
(1)
Installer level
#SYSTEM
menu
PUMP
¼
"Setting the parameters specific to the
CASCADE:
(1)
Installer level
#NETWORK
menu
ON
¼
"Configuring the network", page 91
MASTER CONTROLLER
(1)
Installer level
#NETWORK
menu
ON
SYSTEM NETWORK
(1)
Installer level
#NETWORK
menu
ADD GENE MANU
(1) The parameter is only displayed if
INSTALLATION
parameter is set to
EXTENDED
4
7
8
5
3
2
6
1
C003094-A
4. Installation
AGC 10/15 - AGC 15 - AGC 25 - AGC 35
56
20/01/2012 - 300026081-001-B