7.3.13 Inrush Card
1.
Remove the DC bus rails in accordance with
.
2.
Unplug MK1802.
3.
Remove five screws (T20).
Reinstall in reverse order of this procedure and tighten
hardware according to
1
3
4
5
6
8
9
10
11
2
7
130BX462.10
Figure 7.6 Inrush Card
1
Inrush card
7
(-)DC bus bar DC Coil to
Capacitor Bank
2
T30 screw
8
0.4 in [10 mm] nut
3
(+) DC bus bar
9
(+)DC bus bar DC Coil to
Capacitor Bank
4
T30 screw
10 0.43 in [11 mm] threaded
standoff
5
T30 screw
11 Inrush Support Bracket
6
(-) DC bus bar
Table 7.6 Legend to
7.3.14 IGBT Gate Drive Card
1.
Remove the DC bus bars in accordance with
.
2.
(Brake option only) Unplug MK201.
3.
Unplug Connectors:
•
MK100
•
MK501
•
MK601
•
MK701
•
MK102
4.
Remove six screws (T20 thread-forming).
Reinstall in reverse order of this procedure and tighten
hardware according to
.
7.3.15 SCR Input Bus Bars
1.
Remove the inrush card in accordance with
2.
Remove three standoffs (0.4 in [11 mm] thread-
forming) one on each SCR AC input bus bar.
3.
Remove the black plastic inrush support by
removing two screws (T25).
4.
Remove three screws (T30) connecting the bus
bars to the SCR modules, one from each bus bar.
5.
Remove bus bars.
Reinstall in reverse order of this procedure and tighten
hardware according to
.
NOTICE!
Note for reassembly: Fasten all components hand-tight
and then place the inrush support to align all before
tightening the fasteners.
Disassembly and Assembly In...
Service Manual
MG94A222
Danfoss A/S © Rev. 2014-02-10 All rights reserved.
97
7
7
Summary of Contents for VLT FC 103
Page 2: ......