![background image](http://html1.mh-extra.com/html/danfoss/ec-lts-series/ec-lts-series_user-manual_3454573033.webp)
Figure 16. Shrink tube
8. Insert the cable through the corresponding hole in the electric device frame and connect the
cable lug to the power terminal with the correct screw. Use spring washer between the cable lug
and the connection screw or nut. Do not tighten the cable lug screw at this point to ensure tting
of the cable gland.
Make sure that there is at least 10 mm air gap in between the cable lug and other metallic structures including the braid
of the cable. If the air gap is smaller, use extra insulation shrink tube to cover the lug.
9. Screw the cable gland to the power terminals of the electric device according to instructions.
Tighten the cable gland with the speci ed torque.
Tighten the gable gland from the gable gland body to enclosure with torque 15 Nm. Then tighten the cap of the gable
gland according to the instructions provided by gable gland manufacturer (recommendation P itsch).
10. Tighten the cable lug using the speci ed torque.
11. Repeat the procedure to the other cables and connections.
12. Close the power terminal cover and install the connector shield.
13. Make sure that the power cable shields are grounded properly.
EC-LTS1200-410
5. Installation
32 |
©
Danfoss | Produced By: Danfoss Power Solutions | September 2020
| BC355449988603en-000101