
b. Before travelling, checks should be made to all vehicles for road worthiness,
giving special attention to lights, indicators, screen wipers, registration plates,
brakes, brake lights, steering, security of loads, particularly overhanging
loads, tyre pressure and wear and lack of mud before proceeding onto a
public highway.
c. It is important that checks are made of the coupling and/or hitching of the
drilling rig to any towing vehicle.
d. Where required, long vehicle signs, caution or towing boards should be
securely attached.
e. When towing equipment, correct towing speeds, reversing and manoeuvring
procedures should be observed and assistance obtained where necessary.
Due regard should be paid to road conditions and visibility at all times. Care
should be taken when towing in icy conditions as “jack-knifing” can occur.
The safe towing speed should not be exceeded as there is a risk that
“snaking” may suddenly develop, which may cause the trailer to lose a wheel.
f. Consideration should be given to other road users who may become
impatient and take risks - it is advisable to pull into the side occasionally to let
them pass.
g Where wide, long or heavy loads are to be moved it is advisable to have all
lights on for road travel, even in broad daylight.
h. On arrival at the site, ground conditions should be checked before driving in,
and a watch kept for temporary overhead obstructions.
i. If necessary, an assistant should be used to control traffic if safety dictates.
j. Passengers should not be carried on or around the machine.
k. The driver of the vehicle should check for all round visibility before
commencing any manoeuvre, especially reversing. If necessary, an
assistant should be used to signal. The presence of an assistant does not
relieve the driver of his responsibility, so he should constantly check the rear
view in his mirror, and by direct sight.
l. When manoeuvring vehicles, due regard should be paid to soft ground,
potholes, gradients, slippery grass and mud, and overhead cables. Special
care should be taken when crossing dykes with improvised bridges. At all
times, personnel should keep well clear of moving vehicles in case they
overturn. Where winches must be used, a watch should be kept for flying
ground anchors and rope failures.
m. Loading and un-loading the plant should only be carried out on firm level
ground.
n. The vehicle’s driver should act as assistant during loading and un-loading
operations. Signals should be agreed beforehand and standard procedures
followed.
Summary of Contents for TERRIER Mk 1
Page 2: ......
Page 3: ...SECTION 1 GENERAL...
Page 4: ......
Page 24: ...FIGURE 1 1 SAFETY WEDGE LOCATION...
Page 28: ......
Page 29: ...SECTION 2 TECHNICAL DATA...
Page 30: ......
Page 33: ...SECTION 3 OPERATING INSTRUCTIONS...
Page 34: ......
Page 37: ...FIGURE 3 2 VALVE CONTROLS A B C...
Page 44: ......
Page 45: ...SECTION 4 GUIDANCE FOR DRILLING APPLICATIONS...
Page 46: ......
Page 52: ......
Page 53: ...SECTION 5 RIG MAINTENANCE AND SERVICE...
Page 54: ......
Page 70: ......
Page 71: ...SECTION 6 SPARE PARTS ILLUSTRATIONS AND LISTINGS...
Page 72: ...23...
Page 74: ...25...
Page 76: ...27...
Page 78: ...29...
Page 80: ...31...
Page 82: ...33...
Page 84: ...35...
Page 86: ...37...
Page 88: ...39...
Page 90: ......
Page 91: ...SPARE PARTS ILLUSTRATIONS AND LISTINGS FOR UNDER CARRIAGE ENGINE...
Page 92: ......
Page 93: ......
Page 94: ......
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ......
Page 99: ......
Page 100: ......
Page 101: ......
Page 102: ......
Page 103: ......
Page 104: ......
Page 105: ......
Page 106: ......
Page 107: ......
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 135: ......
Page 136: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ......
Page 145: ......
Page 146: ......
Page 147: ......
Page 148: ......
Page 149: ......
Page 150: ......
Page 151: ......
Page 152: ......
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ......
Page 158: ......
Page 159: ......
Page 160: ......
Page 161: ......
Page 162: ......
Page 163: ......
Page 164: ......
Page 165: ......
Page 166: ......
Page 167: ......
Page 168: ......
Page 169: ......
Page 170: ......
Page 171: ......
Page 172: ......
Page 173: ......
Page 174: ......
Page 175: ......
Page 176: ......
Page 177: ......
Page 178: ......
Page 179: ......
Page 180: ......
Page 181: ......
Page 182: ......
Page 183: ...SPARE PARTS ILLUSTRATIONS AND LISTINGS FOR 7 1 HYDRAULIC ROTARY ATTACHMENT OPTIONAL EXTRA...
Page 192: ......
Page 193: ...APPENDIX A KUBOTA DIESEL ENGINE...
Page 194: ......
Page 195: ......
Page 196: ......
Page 197: ......
Page 198: ......
Page 199: ......
Page 200: ......
Page 201: ......
Page 202: ......
Page 203: ......
Page 204: ......
Page 205: ......
Page 206: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 211: ......
Page 212: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ......
Page 217: ......
Page 218: ......
Page 219: ......
Page 220: ......
Page 221: ......
Page 222: ......
Page 223: ......
Page 224: ......
Page 225: ......
Page 226: ......
Page 227: ......
Page 228: ......
Page 229: ......
Page 230: ......
Page 231: ......
Page 232: ......
Page 233: ...APPENDIX B MESSERSI MINI TRANSPORTER...
Page 234: ......
Page 235: ...USE MAINTENANCE 03672872 MINITRANSPORTER TCH K722 N ______________...
Page 236: ...2...
Page 273: ...39 10 10 NOTES ON MAINTENANCE DATE WORK PERFORMED HOURS WORK PARTS INVOLVED...
Page 274: ......
Page 275: ...APPENDIX C TEST REPORTS...
Page 276: ......