
Withdraw the sample tube from the ground by raising the carriage to the top
of its travel.
Disconnect the sample tube from the machine by undoing the sample tube
connector.
The borehole can be advanced by adding 1.00m long drill rods / casing.
3.8
DYNAMIC PROBING
To carry out Dynamic Probing it is necessary to change the weight and drop
height.
Remove front weight guard then undo the weight guide rod retaining plates
on top of the carriage and the bolts on top of the weight. Lift up the left hand
weight guide rod (looking from in front of the mast) swing out the weight and
separate the top section of the weight. Undo the lifting bracket behind the
weight, rotate bracket through 180 degrees so that fork is now at the top and
relocate screws. Then bolt the Dynamic Probe Bracket on to the top of the
bottom weight. Push weight back into operating position and relocate the left
hand guide rod. Then pull up the right hand guide sufficiently to allow the top
section of eight to be removed. Relocate right hand guide rod and reattach
the guide rod retaining plates. Replace guard.
Machine is now set for dynamic probing with a 50kg weight and 500mm drop.
Dynamic Probing should be carried out by the same method as soil sampling
3.7 above.
3.9
CONCRETE CORING
To core concrete raise carriage to allow the coring unit to be attached to the
sample tube connector
.
Connect the hydraulic hoses from the weight motor (Drg PST2010F200) to
the quick connects on the coring unit. Lower carriage until core bit is in
contact with the ground. Use the weight control lever to operate the coring
rotation.
When coring you must ensure that the rig is level and that the leg screws are
adjusted correctly.
3.10
REMOTE DRILLING
With mast in vertical drilling position on solid ground turn off engine.
Disconnect the four hydraulic hose quick connects on rig body. Remove the 2
locking pins at base of mast (Drg PST2000/F/200). Start engine and reverse
track undercarriage to separate mast assembly from main rig body.
Wheel mast assembly to required drilling position, then attach rear support
legs. Position remote control stand at drilling position.
Summary of Contents for TERRIER Mk 1
Page 2: ......
Page 3: ...SECTION 1 GENERAL...
Page 4: ......
Page 24: ...FIGURE 1 1 SAFETY WEDGE LOCATION...
Page 28: ......
Page 29: ...SECTION 2 TECHNICAL DATA...
Page 30: ......
Page 33: ...SECTION 3 OPERATING INSTRUCTIONS...
Page 34: ......
Page 37: ...FIGURE 3 2 VALVE CONTROLS A B C...
Page 44: ......
Page 45: ...SECTION 4 GUIDANCE FOR DRILLING APPLICATIONS...
Page 46: ......
Page 52: ......
Page 53: ...SECTION 5 RIG MAINTENANCE AND SERVICE...
Page 54: ......
Page 70: ......
Page 71: ...SECTION 6 SPARE PARTS ILLUSTRATIONS AND LISTINGS...
Page 72: ...23...
Page 74: ...25...
Page 76: ...27...
Page 78: ...29...
Page 80: ...31...
Page 82: ...33...
Page 84: ...35...
Page 86: ...37...
Page 88: ...39...
Page 90: ......
Page 91: ...SPARE PARTS ILLUSTRATIONS AND LISTINGS FOR UNDER CARRIAGE ENGINE...
Page 92: ......
Page 93: ......
Page 94: ......
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ......
Page 99: ......
Page 100: ......
Page 101: ......
Page 102: ......
Page 103: ......
Page 104: ......
Page 105: ......
Page 106: ......
Page 107: ......
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 135: ......
Page 136: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ......
Page 145: ......
Page 146: ......
Page 147: ......
Page 148: ......
Page 149: ......
Page 150: ......
Page 151: ......
Page 152: ......
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ......
Page 158: ......
Page 159: ......
Page 160: ......
Page 161: ......
Page 162: ......
Page 163: ......
Page 164: ......
Page 165: ......
Page 166: ......
Page 167: ......
Page 168: ......
Page 169: ......
Page 170: ......
Page 171: ......
Page 172: ......
Page 173: ......
Page 174: ......
Page 175: ......
Page 176: ......
Page 177: ......
Page 178: ......
Page 179: ......
Page 180: ......
Page 181: ......
Page 182: ......
Page 183: ...SPARE PARTS ILLUSTRATIONS AND LISTINGS FOR 7 1 HYDRAULIC ROTARY ATTACHMENT OPTIONAL EXTRA...
Page 192: ......
Page 193: ...APPENDIX A KUBOTA DIESEL ENGINE...
Page 194: ......
Page 195: ......
Page 196: ......
Page 197: ......
Page 198: ......
Page 199: ......
Page 200: ......
Page 201: ......
Page 202: ......
Page 203: ......
Page 204: ......
Page 205: ......
Page 206: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 211: ......
Page 212: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ......
Page 217: ......
Page 218: ......
Page 219: ......
Page 220: ......
Page 221: ......
Page 222: ......
Page 223: ......
Page 224: ......
Page 225: ......
Page 226: ......
Page 227: ......
Page 228: ......
Page 229: ......
Page 230: ......
Page 231: ......
Page 232: ......
Page 233: ...APPENDIX B MESSERSI MINI TRANSPORTER...
Page 234: ......
Page 235: ...USE MAINTENANCE 03672872 MINITRANSPORTER TCH K722 N ______________...
Page 236: ...2...
Page 273: ...39 10 10 NOTES ON MAINTENANCE DATE WORK PERFORMED HOURS WORK PARTS INVOLVED...
Page 274: ......
Page 275: ...APPENDIX C TEST REPORTS...
Page 276: ......