Derigging
7. Detaching the compression, safety chain and hoists
Once the last assembly is stored on the cart and lowered onto the
ground, detach the compression and the safety chain and
disconnect the hoists.
8. Detaching and storing the load beam
1. Release the Locking pins of the flying frame.
2. Detach the load beam and reinsert the Locking pins of the
flying frame.
3. Store the load beam in the dedicated slots of the touring cart.
9.3 Tension mode disassembly
In Tension mode, the derigging procedure follows the setup
procedure in reverse order. That means the Splay links have to be
disengaged manually cabinet by cabinet. Proceed as follows:
1. Disengage cabinet by cabinet
1. Lower the array to a height of approx. 30 cm (1 ft) above
ground.
2. Attach the touring cart to the front of the lowest cabinet.
3. At the rear, release Locking pin
[2] of the lowest cabinet.
4. Slightly lift the back of the cabinet and disengage the Splay
link of the upper cabinet and keep on holding the cabinet.
5. At the center rear Splay link slot of the cart, release the bottom
Locking pin.
6. Lower the cabinet until its Splay link fits into the slot.
7. Slightly lift the back of the cabinet until the Splay link has
engaged and reinsert the bottom Locking pin.
8. Insert Locking pin
[1] into the 0° hole at the top of the center
hole index (
Þ
Red labeled hole -
).
2. Disengaging cabinet by cabinet
1. On the next cabinet, release Locking pin
[2].
2. Slightly lift the back of the cabinet and disengage the Splay
link.
3. Lower the cabinet until its Splay link fits into the rear rigging
strand of the bottom cabinet.
4. Lift the back of the cabinet until its Splay link engaged to
preset Locking pin
[1] (0°) of the bottom cabinet.
5. Reinsert Locking pin
[2] (Safety pin) of the bottom cabinet.
6. For the next two cabinets, proceed in the same manner.
3. Separating the first cabinet assembly
1. Slowly lower the array onto the ground until the Front links are
free of load.
2. Release the Locking pins of the Front links on both sides.
3. Lift the array and store the Front links.
4. For the remaining cabinet assemblies, proceed in the same
manner.
4. Detaching the safety chain and hoists
Once the last assembly is stored on the cart and lowered onto the
ground, detach the safety chain and disconnect the hoists.
5. Detaching and storing the load beam
1. Release the Locking pins of the flying frame.
2. Detach the load beam and reinsert the Locking pins of the
flying frame.
3. Store the load beam in the dedicated slots of the touring cart.
d&b XSL Rigging manual 1.1 en
- preliminary -
43