1
English
RQYQ140PY1
RQYQ180PY1
RQCYQ280PY1
RQCYQ360PY1
RQCYQ460PY1
RQCYQ500PY1
RQCYQ540PY1
RQEQ140PY13
RQEQ180PY13
RQEQ212PY13
RQCEQ280PY13
RQCEQ360PY13
RQCEQ460PY13
RQCEQ500PY13
RQCEQ540PY13
RQCEQ636PY13
RQCEQ712PY13
RQCEQ744PY13
RQCEQ816PY13
RQCEQ848PY13
VRV
III
System air conditioner
VRV
III
-Q Series
Installation manual
CONTENTS
1. FIRST OF ALL ......................................................................... 1
1-1.
Safety precautions.......................................................... 1
1-2.
Special notice of product ................................................ 2
1-3.
Disposal requirements.................................................... 3
2. INTRODUCTION...................................................................... 3
2-1.
Combination ................................................................... 3
2-2.
Standard supplied accessories....................................... 3
2-3.
Option accessory............................................................ 4
2-4.
Technical and Electrical specifications ........................... 4
2-5.
Main components ........................................................... 4
2-6.
Installation Process ........................................................ 4
3. SELECTION OF LOCATION ................................................... 4
4. INSPECTING AND HANDLING THE UNIT ............................. 5
5. PLACING THE UNIT................................................................ 5
6. REFRIGERANT PIPING .......................................................... 5
6-1.
Selection of piping material and Refrigerant
branching kit ................................................................... 5
6-2.
Protection against contamination
when installing pipes ...................................................... 6
6-3.
Pipe connection .............................................................. 6
6-4.
Connecting the refrigerant piping ................................... 6
6-5.
Example of connection ................................................... 9
7. FIELD WIRING ...................................................................... 15
7-1.
Power circuit, safety device, and cable requirements .. 15
7-2.
Wiring Connection Example for Whole System............ 16
7-3.
Leading wire Procedure................................................ 16
7-4.
Transmission Wiring Connection Procedure ................ 16
7-5.
Power Wiring Connection Procedure ........................... 17
7-6.
Procedure for Wiring Inside Units................................. 17
8. AIR TIGHT TEST AND VACUUM DRYING ........................... 17
8-1.
Preparations ................................................................. 18
8-2.
Air tight test and vacuum drying method ...................... 18
9. PIPE INSULATION ................................................................ 18
10. CHECKING OF DEVICE AND INSTALLATION
CONDITIONS ........................................................................ 19
11. ADDITIONAL REFRIGERANT CHARGE AND CHECK
OPERATION .......................................................................... 19
11-1. Before working.............................................................. 19
11-2. Procedure of check operation....................................... 20
12. ONSITE SETTINGS............................................................... 26
12-1. Onsite Settings With the Power Off .............................. 26
12-2. Onsite Settings With the Power On .............................. 26
13. TEST RUN ............................................................................. 26
13-1. Before test run .............................................................. 26
13-2. Test Run ....................................................................... 26
13-3. Checks After Test Run ................................................. 26
14. CAUTION FOR REFRIGERANT LEAKS ............................... 26
The English text is the original instruction. Other languages are
translations of the original instructions.
1.
FIRST OF ALL
• Use the BS unit with Heat Recovery series (RQCEQ).
• This document is an installation manual for the Daikin VRV
III
-Q
Series VRV Inverter. Before installing the unit, read this manual
thoroughly, and following the instructions contained in it. After
installation, do a test run to make sure the unit runs properly, and
then explain how to operate and take care of the unit to the cus-
tomer, using the operation manual.
• Lastly, make sure the customer keeps this manual, along with the
operation manual, in a safe place.
• This manual does not describe how to install the indoor unit.
Refer to the installation manual included with the indoor unit for that.
1-1 Safety precautions
Please read these “Safety precautions” carefully before installing air
conditioning equipment and be sure to install it correctly.
Meaning of WARNING and CAUTION notices.
Both are important notices for safety. Be sure to follow them.
WARNING
.....Failure to follow these instructions properly may
result in personal injury or loss of life.
CAUTION
......Failure to observe these instructions properly
may result in property damage or personal
injury, which may be serious depending on the
circumstances.
After completing installation, conduct a test operation to confirm that
the equipment operates without any problems. Then, explain to the
customer how to operate the equipment and take care of it following
the operation manual. Ask the customer to store the installation man-
ual along with the operation manual for future reference.
This air conditioner comes under the term “appliances not accessible
to the general public”.
VRV System is a class A product. In a domestic environment this
product may cause radio interference in which case the user may be
required to take adequate measures.
WARNING
• Ask your dealer or qualified personnel to carry out installation
work.
Do not attempt to install the air conditioner yourself. Improper
installation may result in water leakage, electric shocks or fire.
• Install the air conditioner in accordance with the instructions in
this installation manual.
Improper installation may result in water leakage, electric shocks
or fire.
• When installing the unit in a small room, take measures so that
the refrigerant may not exceed the limiting concentration in the
event of refrigerant leakage.
Contact your dealer for further information. If the refrigerant leaks
and exceeds the limiting concentration, it may lead to oxygen defi-
ciency.
• Be sure to use only the specified accessories and parts for instal-
lation work.
Failure to use the specified parts may result in the unit falling,
water leakage, electric shocks or fire.
• Install the air conditioner on a foundation strong enough to with-
stand the weight of the unit.
If a foundation does not have sufficient strength, the equipment
may fall and cause injury.
• Carry out the required installation work in consideration of strong
winds, typhoons or earthquakes.
If the installation work is not properly carried out, the unit may fall
down and cause accidents.
• The electrical work must be carried out by the qualified electrician
in accordance with the local laws and regulations and this instal-
lation manual. Make sure to provide a dedicated power supply cir-
cuit and never connect additional wiring to the existing circuit.
An insufficient power supply capacity or improper electrical work
may lead to electric shocks or fire.
• Be sure to earth the air conditioner.
Do not earth the unit to a utility pipe, lightning conductor or tele-
phone earth lead.
Imperfect earthing may result in electric shocks or fire.
A high surge current from lightning or other sources may cause
damage to the air conditioner.
• Be sure to install an earth leakage breaker.
Failure to install an earth leakage breaker may result in electric
shocks or fire.
• Be sure to switch off the unit before touching any electrical parts.
Touching a live part may result in electric shock.
01_EN_3P226891-14T.fm Page 1 Tuesday, September 30, 2014 7:48 PM