
Test Operation
Si39-303
62
General Information
4.
Test Operation
4.1
Procedure and Outline
Follow the following procedure to conduct the initial test operation after installation.
4.1.1 Check work prior to turn power supply on
4.1.2 Turn power on
Check on refrigerant piping
Check on amount of refrigerant
charge
(V3055)
Check the below items.
2
Power wiring
2
Control transmission wiring
between units
2
Earth wire
¡
Is the wiring performed as specified?
¡
Are the designated wires used?
¡
Is the grounding work completed?
Use a 500V megger tester to measure the insulation.
2
Do not use a megger tester for other circuits than 200V (or
240v) circuit.
¡
Are the setscrews of wiring not loose?
¡
Is pipe size proper? (The design pressure of this product is
3.8MPa.)
¡
Are pipe insulation materials installed securely?
Liquid and gas pipes need to be insulated. (Otherwise causes
water leak.)
¡
Are respective stop valves on liquid, gas and oil equalizing lines
securely open?
¡
Is refrigerant charged up to the specified amount?
If insufficient, charge the refrigerant from the service port of stop
valve on the liquid side with outdoor unit in stop mode after turning
power on.
¡
Has the amount of refrigerant charge been recorded on “Record
Chart of Additional Refrigerant Charge Amount”?
Turn outdoor unit power on.
Carry out field setting on
outdoor PC board
Turn indoor unit power on.
(V3056)
¡
Be sure to turn the power on 6 hours before starting operation to
protect compressors. (to power on clankcase heater)
¡
For field settings, refer to “Field Settings” on and after P95.
After the completion of field settings, set to “Setting mode 1”.
Summary of Contents for VRV II Series
Page 6: ...Si39 303 iv Table of Contents...
Page 31: ...Si39 303 Installation General Information 25 Flaring Procedure...
Page 124: ...Appendix Si39 303 118 General Information 3P114237A...
Page 141: ...Si39 303 Appendix General Information 135 RXYQ8MY1B RXYQ10MY1B RXYQ12MY1B 4D040338A...
Page 142: ...Appendix Si39 303 136 General Information RXYQ14MY1B RXYQ16MY1B 4D040339A...
Page 144: ...Appendix Si39 303 138 General Information 7 11 Wiring Diagrams 7 11 1 Outdoor Unit RXYQ5MY1B...
Page 145: ...Si39 303 Appendix General Information 139 RXYQ8MY1B RXYQ10MY1B RXYQ12MY1B 3D038582...
Page 146: ...Appendix Si39 303 140 General Information RXYQ14MY1B RXYQ16MY1B 3D038058...
Page 147: ...Si39 303 Appendix General Information 141 7 11 2 Field Wiring RXYQ5 16MY1B 3D040746...
Page 148: ...Appendix Si39 303 142 General Information RXYQ18 32MY1B 3D040747...
Page 149: ...Si39 303 Appendix General Information 143 RXYQ34 48MY1B 3D040748...
Page 158: ...Appendix Si39 303 152 General Information...
Page 180: ...Refrigerant Piping Si39 303 174 Installation Manual...
Page 226: ...Troubleshooting Si39 303 220 Operation Manual...