
What to Do Before Operation
Si39-303
202
Operation Manual
2. What to Do Before Operation
This operation manual is for the following systems with standard control. Before initiating
operation, contact your Daikin dealer for the operation that corresponds to your system type and
mark.
If your installation has a customized control system, ask your Daikin dealer for the operation that
corresponds to your system.
Outdoor units
!
Names and functions of parts
RXYQ series
REYQ series
Cool/heat
changeover remote
control switch
Operation modes
Inverter series
heat pumps RXYQ
series
yes
no
Heat recovery series
heat pumps REYQ series
yes
no
1. Outdoor unit
2. Indoor unit
3. Remote controller
4. Inlet air
5. Outlet air
6. BS (Branch selection) unit
7. Cool/heat changeover remote control switch
(Left figure shows systems with changeover
remote control switches)
Summary of Contents for VRV II Series
Page 6: ...Si39 303 iv Table of Contents...
Page 31: ...Si39 303 Installation General Information 25 Flaring Procedure...
Page 124: ...Appendix Si39 303 118 General Information 3P114237A...
Page 141: ...Si39 303 Appendix General Information 135 RXYQ8MY1B RXYQ10MY1B RXYQ12MY1B 4D040338A...
Page 142: ...Appendix Si39 303 136 General Information RXYQ14MY1B RXYQ16MY1B 4D040339A...
Page 144: ...Appendix Si39 303 138 General Information 7 11 Wiring Diagrams 7 11 1 Outdoor Unit RXYQ5MY1B...
Page 145: ...Si39 303 Appendix General Information 139 RXYQ8MY1B RXYQ10MY1B RXYQ12MY1B 3D038582...
Page 146: ...Appendix Si39 303 140 General Information RXYQ14MY1B RXYQ16MY1B 3D038058...
Page 147: ...Si39 303 Appendix General Information 141 7 11 2 Field Wiring RXYQ5 16MY1B 3D040746...
Page 148: ...Appendix Si39 303 142 General Information RXYQ18 32MY1B 3D040747...
Page 149: ...Si39 303 Appendix General Information 143 RXYQ34 48MY1B 3D040748...
Page 158: ...Appendix Si39 303 152 General Information...
Page 180: ...Refrigerant Piping Si39 303 174 Installation Manual...
Page 226: ...Troubleshooting Si39 303 220 Operation Manual...