General Information
Method for
Replacing
Nitrogen
(Brazing)
If brazing work is carried out without passing nitrogen gas through the pipes which are being brazed then
this allows the formation of oxidation bubbles on the inside surface of the pipes. These oxidation bubbles
are then carried along inside the pipes to cause damage to various members of the system such as valves
or compressors and the system ceases to function properly.
In order to avoid this problem
nitrogen is passed through the pipes while the soldering work is being
carried out
. This operation is known as nitrogen replacement. (Air is replaced by nitrogen)
This is
standard work practice for all brazing work
.
Important points:
1. The gas used must be nitrogen (oxygen, carbon dioxide and flon should not be used.)
2. A pressure regulator must be used.
Summary of Contents for VRV II Series
Page 6: ...Si39 303 iv Table of Contents...
Page 31: ...Si39 303 Installation General Information 25 Flaring Procedure...
Page 124: ...Appendix Si39 303 118 General Information 3P114237A...
Page 141: ...Si39 303 Appendix General Information 135 RXYQ8MY1B RXYQ10MY1B RXYQ12MY1B 4D040338A...
Page 142: ...Appendix Si39 303 136 General Information RXYQ14MY1B RXYQ16MY1B 4D040339A...
Page 144: ...Appendix Si39 303 138 General Information 7 11 Wiring Diagrams 7 11 1 Outdoor Unit RXYQ5MY1B...
Page 145: ...Si39 303 Appendix General Information 139 RXYQ8MY1B RXYQ10MY1B RXYQ12MY1B 3D038582...
Page 146: ...Appendix Si39 303 140 General Information RXYQ14MY1B RXYQ16MY1B 3D038058...
Page 147: ...Si39 303 Appendix General Information 141 7 11 2 Field Wiring RXYQ5 16MY1B 3D040746...
Page 148: ...Appendix Si39 303 142 General Information RXYQ18 32MY1B 3D040747...
Page 149: ...Si39 303 Appendix General Information 143 RXYQ34 48MY1B 3D040748...
Page 158: ...Appendix Si39 303 152 General Information...
Page 180: ...Refrigerant Piping Si39 303 174 Installation Manual...
Page 226: ...Troubleshooting Si39 303 220 Operation Manual...