SiUS12-928_B
Trial Operation and Field Settings
254
Part 8
Trial Operation and
Field Settings
1. Pump Down Operation............................................................................255
2. Forced Operation ....................................................................................256
3. Wiring Error Check Function ...................................................................257
4. Trial Operation ........................................................................................259
5. Field Settings ..........................................................................................261
5.1
Outdoor Unit ............................................................................................. 261
5.2
Indoor Unit................................................................................................ 264
6. Application of Silicon Grease to a Power Transistor and a
Diode Bridge ...........................................................................................267