Outdoor Unit: 2MXS18GVJU
SiUS12-928_B
209
Removal Procedure
1.3
Removal of PCBs
Procedure
Warning
Be sure to wait for 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
Remove the screw of the
main PCB, and unfasten
the 2 hooks.
When reassembling, insert
the base bar into the hole of
the main PCB.
2
Unfasten the hook of the
terminal board, and open
the terminal board.
3
Disconnect each
connector [S11] [HE] [HL]
[HN] on the back of the
terminal board.
4
Disconnect the
connectors [S52] [S102]
from the service monitor
PCB.
Main PCB
(R2177)
Base bar
(R2178)
Hook
[S11]
[HL]
[HN]
(R17403)
[HE]
(R17347)
[S102]
[S52]
Service monitor PCB