![Daikin Split Comfora R32 Service Manual Download Page 48](http://html1.mh-extra.com/html/daikin/split-comfora-r32/split-comfora-r32_service-manual_2459095048.webp)
2
|
Components
Service manual
48
ATXP20~35 + FTXP20~71 + ARXP20~35 + RXP20~71
Split Comfora R32
ESIE18-01C – 2020.07
a
a
a
a
Faston connector
7
Install the compressor insulation.
8
Turn ON the power using the respective circuit breaker.
9
Start the unit operation via the user interface.
10
Wait for – or create condition to operate the compressor.
11
Once the compressor operates, measure the U-V-W inverter voltages. All
measurements MUST be the same.
Inverter voltage measurements are
correct?
Action
Yes
Continue with the next step.
No
Replace the inverter PCB, see
73].
12
Measure the current in each phase U, V and W while compressor is operating.
All measurements MUST be the same.
Compressor motor winding current
measurements are correct?
Action
Yes
Perform an insulation check of the
compressor, see
44].
No
Preventively replace the compressor,
see
50].
To perform an insulation check of the compressor
Prerequisite:
First perform an electrical check of the compressor, see
Prerequisite:
Stop the unit operation via the user interface.
1
Turn OFF the respective circuit breaker.
DANGER: RISK OF ELECTROCUTION
Wait for at least 10 minutes after the circuit breaker has been turned OFF, to be sure
the rectifier voltage is below 10 V DC before proceeding.