ESIE04-01
Field settings
Part 4 – Commissioning and Test Run
4–27
3
4
5
1
2.13.2 External activation from optional PCB
Graph
Silent operation can also be activated from the optional PCB.
Silent operation will start when the contact on LNOP-COM is closed and will remain active as long as
the contact is closed. No field setting on the outdoor unit or by remote controller is required.
Silent operation will be ended when the contact is re-opened.
Use of the KRP58M enables the use of an external time clock.
Capacity priority
Setting
Same as with the automatic control, priority for capacity can be set.Prioirity for capacity will be
activated by changing field setting 26-0-03 in combination with the closed contact on KRP58M.
Exceptions
The silent operation will be overruled in the following conditions:
P
Pump down residual operation
P
Startup control
P
Defrost operation
P
Oil recovery
Sound reduction
Power supply connector
(on outdoor PCB X77A)
Output on X801M = 12VDC, 12mA
Maximum wire length = 100 meter
Transmission connector
(on outdoor PCB X6A)
Description
Mode
First
Code
Second Code
01
02
03
04
Silent Operation
16(26)
0
Factory
---
Capacity
priority
---
71
100
125
Sound reduction
4 dBA
4 dBA
5 dBA
RZQ - Final.book Page 27 Wednesday, September 8, 2004 8:40 AM
Summary of Contents for RZQ71~125B7V3B
Page 1: ...Service Manual ESIE04 01 RZQ71 125B7V3B Sky Air Inverter R 410A B series ...
Page 2: ......
Page 24: ...ESIE04 01 1 2 Part 1 System Outline 3 1 1 5 ...
Page 32: ...General Outline Outdoor Units ESIE04 01 1 10 Part 1 System Outline 3 1 1 4 5 ...
Page 64: ...General Outline Indoor Units ESIE04 01 1 42 Part 1 System Outline 3 1 1 4 5 ...
Page 76: ...Specifications ESIE04 01 1 54 Part 1 System Outline 3 1 1 4 5 ...
Page 92: ...Functional Diagrams ESIE04 01 1 70 Part 1 System Outline 3 1 1 4 5 ...
Page 94: ...ESIE04 01 1 72 Part 1 System Outline ...
Page 122: ...Wiring Diagrams ESIE04 01 1 100 Part 1 System Outline 3 1 1 4 5 ...
Page 140: ...ESIE04 01 2 2 Part 2 Functional Description 3 1 2 5 ...
Page 162: ...General Functionality ESIE04 01 2 24 Part 2 Functional Description 3 1 2 4 5 ...
Page 200: ...Outdoor Unit Functional Concept ESIE04 01 2 62 Part 2 Functional Description 3 1 2 4 5 ...
Page 202: ...ESIE04 01 3 2 Part 3 Troubleshooting 3 1 3 5 ...
Page 288: ...Error Codes Outdoor Units ESIE04 01 3 88 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 312: ...Additional Checks for Troubleshooting ESIE04 01 3 112 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 314: ...ESIE04 01 4 2 Part 4 Commissioning and Test Run 3 1 4 5 ...
Page 356: ...ESIE04 01 5 2 Part 5 Disassembly and Maintenance 3 1 5 ...
Page 484: ...ESIE04 01 viii Index 3 1 4 5 ...