
ESIE04-01
Field settings
Part 4 – Commissioning and Test Run
4–31
3
4
5
1
Function details
Parameters
Factory setting
Low humidity application
setting
Low humidity appli
freeze up operation pre-
vention
Field Setting
16(26)-2-01
16(26)-2-03
16(26)-2-04
Compressor control
P
The compressor frequency is controlled in function of the target evaporating temperature.
P
The target evaporating temperature is controlled in function of the cooling load.
Minimum target Te = 2°C
Minimum target Te = 0°C
Initial minimum target Te =
2°C, but can be changed in
function of actual Te, to
avoid freeze up activation:
P
Te
≤
-1°C for 20 minutes
accumulated => Change
target Te
≥
5°C
P
Te
≤
-1°C for 30 minutes
accumulated => Change
target Te
≥
8°C
See graph 1
See graph 2
See graph 3
Freeze protec-
tion function
Start
Te
≤
-1°C for 40 minutes
accumulated
OR
Te
≤
A°C for 1 minute
continuous
(Indoor decision)
Te
≤
-1°C for 40 minutes
accumulated
OR
Te
≤
-3°C for 1 minute
continuous
(Outdoor decision)
Te
≤
-1°C for 40 minutes
accumulated
OR
Te
≤
A°C for 1 minute
continuous
(Outdoor decision)
End
Te > 7°C for 10 minutes
continuously.
(Indoor decision)
Te > 7°C for 3 minutes
continuously
OR
Te > 4°C for 20 minutes
continuously
(Outdoor decision)
Te > 7°C for 3 minutes
continuously
OR
Te > 4°C for 20 minutes
continuously
(Outdoor decision)
FAQ
FHQ
All except FAQ & FHQ
A
-1°C
-3°C
-5°C
RZQ - Final.book Page 31 Wednesday, September 8, 2004 8:40 AM
Summary of Contents for RZQ71~125B7V3B
Page 1: ...Service Manual ESIE04 01 RZQ71 125B7V3B Sky Air Inverter R 410A B series ...
Page 2: ......
Page 24: ...ESIE04 01 1 2 Part 1 System Outline 3 1 1 5 ...
Page 32: ...General Outline Outdoor Units ESIE04 01 1 10 Part 1 System Outline 3 1 1 4 5 ...
Page 64: ...General Outline Indoor Units ESIE04 01 1 42 Part 1 System Outline 3 1 1 4 5 ...
Page 76: ...Specifications ESIE04 01 1 54 Part 1 System Outline 3 1 1 4 5 ...
Page 92: ...Functional Diagrams ESIE04 01 1 70 Part 1 System Outline 3 1 1 4 5 ...
Page 94: ...ESIE04 01 1 72 Part 1 System Outline ...
Page 122: ...Wiring Diagrams ESIE04 01 1 100 Part 1 System Outline 3 1 1 4 5 ...
Page 140: ...ESIE04 01 2 2 Part 2 Functional Description 3 1 2 5 ...
Page 162: ...General Functionality ESIE04 01 2 24 Part 2 Functional Description 3 1 2 4 5 ...
Page 200: ...Outdoor Unit Functional Concept ESIE04 01 2 62 Part 2 Functional Description 3 1 2 4 5 ...
Page 202: ...ESIE04 01 3 2 Part 3 Troubleshooting 3 1 3 5 ...
Page 288: ...Error Codes Outdoor Units ESIE04 01 3 88 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 312: ...Additional Checks for Troubleshooting ESIE04 01 3 112 Part 3 Troubleshooting 3 1 3 4 5 ...
Page 314: ...ESIE04 01 4 2 Part 4 Commissioning and Test Run 3 1 4 5 ...
Page 356: ...ESIE04 01 5 2 Part 5 Disassembly and Maintenance 3 1 5 ...
Page 484: ...ESIE04 01 viii Index 3 1 4 5 ...