IM 1287-4 • REBEL APPLIED ROOFTOP 80 www.DaikinApplied.com
Unit Operation
Figure 137: View Status Menu Structure
View Status
Unit Status/Settings
►
Occupancy
►
Temperatures
►
Flow Status
►
SAF Cap Control
►
RF/EF Control
►
Cooling
►
Economizer
►
Heating
►
Dehumidification
►
Power Monitor
►
Date/Time/Schedules
►
Date/Time
►
Unit Status/Settings
Unit State= _____________
Unit Status = ___________
MWU Status = __________
System Mode= Local
ClgIntrLock=____________
CmpCapIn=_____________
RhtCapIn=______________
AlmReset In=___________
Dehum Status = _________
Ctrl Mode= Off
Clg Status= ____________
Htg Status= ____________
Econo Status= __________
Clg Capacity= XXX%
Htg Capacity= XXX%
Rht Capacity= XXX%
SAF Capacity= XXX%
RF/EF Capacity = XXX%
OAD Position= XXX%
Rel Hum1 = XXX%
Rel Hum2 = XXX%
Net Emrg Ovrd=Normal
Net App Mode= Auto
Power Monitor
TotalUnitkWh=__________
Unit kW= ______________
PeakUnitkW= __________
AverageUnitkW= ________
L1L2Voltage= ___________
L2L3Voltage= ___________
L1L3Voltage= ___________
L1kW= ________________
L2kW= ________________
L3kW= ________________
L1Current= _____________
L2Current= _____________
L3Current= _____________
NetSyskVAR= __________
kVAR L1= ______________
kVAR L2= ______________
kVAR L3= ______________
kVA L1= _______________
kVA L2= _______________
kVA L3= _______________
Power Factor= __________
Accm kVARh L1= ________
Accm kVARh L2= ________
Accm kVARh L3= ________
Accm kVARh= __________
Date/Time/Schedules
Time= hh:mm:ss
Date= MM/DD/YYYY
UTC Diff= -60
Daily Schedule
Mon= HH:MM-HH:MM
Tue= HH:MM-HH:MM
Wed= HH:MM-HH:MM
Thu= HH:MM-HH:MM
Fri= HH:MM-HH:MM
Sat= HH:MM-HH:MM
Sun= HH:MM-HH:MM
Hol= HH:MM-HH:MM
Holiday Dates
Hol 1= MMMDD/YY-MMDD/YY
Hol 2= MMMDD/YY-MMDD/YY
Hol 3= MMMDD/YY-MMDD/YY
Hol 4= MMMDD/YY-MMDD/YY
Hol 5= MMMDD/YY-MMDD/YY
Hol 6= MMMDD/YY-MMDD/YY
Hol 7= MMMDD/YY-MMDD/YY
Hol 8= MMMDD/YY-MMDD/YY
Hol 9= MMMDD/YY-MMDD/YY
Hol 10= MMMDD/YY-MMDD/YY
One Event Schedule
Beg=MMMDD/YY @ HH:MM
End=MMMDD/YY @ HH:MM
Optimal Start
Enable= No
Htg Rate= 0.4°F/min
Htg OAT= 35.0°F
Des Htg OAT= 0.0°F
Clg Rate= 0.4°F/mi
Clg OAT= 85.0°F
Des Clg OAT= 95.0°F
Daylight Savings
DLS Strt Month=Mar
DLS Strt Week=2ndWeek
DLS Endt Month=Nov
DLS Endt Week=1stWeek
DLS Enable=Auto
Purge
Max Purge= 0min
Dehumidification
Dehum Status= _________
DH Bleeddown= ______
Rel Hum1 = XXX%
Rel Hum2 = XXX%
Dewpoint1= XXX°F
Dewpoint2= XXX°F
Reheat Spt= XXX°F
Reheat Cap= XXX%
Cooling
Clg Capacity=XXX%
Clg Status= ____________
VCmp1= Off
VCmp2= Off
VCmp1 Cmd= 0%
VCmp2 Cmd= 0%
FCmp1= Of f
FCmp2= Of f
FCmp3= Of f
FCmp4= Of f
FCmp5= Of f
FCmp6= Of f
Date/Time
Time= hh:mm:ss
Date= MM/DD/YYYY
UTC Diff= -60min
Daylight Savings
DLS Strt Month=Mar
DLS Strt Week=2ndWeek
DLS Endt Month=Nov
DLS Endt Week=1stWeek
DLS Enable=Auto
Temperatures
Control Temp= XXX°F
Disch Air= XXX°F
Return Air= XXX°F
EffSpace T= XXX°F
Space Temp 1=XXX°F
Space Temp 2=XXX°F
Space Temp 3=XXX°F
OA Temp= XXX°F
EF/LC Temp= XXX°F
ER LWT= XXX°F
ER EWT= XXX°F
DRT1= XXX°F
DRT2= XXX°F
SRT1= XXX°F
SRT2= XXX°F
VCmp1 Temp= XXX°F
VCmp2 Temp= XXX°F
LRT1= XXX°F
LRT2= XXX°F
Occupancy
Occupancy= ____________
Occ Mode= Auto/Net
OccSrc= _______________
UnoccSrc= _____________
Tnt Ovrde Tm= 0 Min
TstatTO= Yes
SAF Cap Control
SAF Capacity= XXX%
SAF Cap Cmd= XXX%
SAF Duct Press= X.Xin
CO2 PPM = XXXXppm
OA Flow= XXXXXCFM
Bldg Press= X.XXin
Heating
Htg Capacity=XXX%
Htg Status=_____________
Htg Stg 1= Off
Htg Stg 2= Off
Htg Stg 3= Off
Htg Stg 4= Off
Economizer
OAD Position= XXX%
Min OA Pos= XXX%
Econo Status = _________
FreeClgStatus = _________
RF/EF Control
RF/EF Cap= XXX%
RFEF Cap Cmd= XXX
Bldg Press= X.XX
RFEF Flow=XXXXXCFM
RAF DectPress=-X.Xin
Flow Status
Airflow= _______________
Supply Fan= ___________
Ret/Exh Fan= ___________
Summary of Contents for Rebel Applied DPSA
Page 147: ...Figure 181 600 MBH 5 1 Modulation 400 MBH and 600 MBH 10 1 Modulation ...
Page 160: ......
Page 161: ......