
Installation
www.DaikinApplied.com 27
IM 1287-4 • REBEL APPLIED ROOFTOP
Table 2: Rebel Applied Roof Curb Assembly Dimensions,
Return Configurations
Unit
Size
Return
Configuration
A
B
C
D
E
in . (mm)
in .
(mm)
in .
(mm)
in . (mm)
in .
(mm)
B
Cabinet
None
3.70
(93.9)
36
(914.4)
3.70
(93.9)
82.0
(2082.8)
55.75
(1416)
Standard
Return Fans
Offset Return
Fans
Prop Exhaust
High Static
Exhaust
30.86
(783.8)
Energy Wheel
56.86
(1444.2)
Table 3: Rebel Applied Roof Curb Assembly Dimensions,
Supply Configurations
Unit
size
Supply
Configuration
J
K
L
M
P
in . (mm) in . (mm) in . (mm) in . (mm) in . (mm)
B
Cabinet
Standard
Discharge
4.03
(102.4)
24.75
(628.6)
1.5
(38.1)
70.5
(1791)
55.75
(1416)
Short Out of
Air Stream
52.03
(1322)
Long Out of
Air Stream
76.03
(1931)
NOTE: Dimensions Q and R can be found in unit documentation (submittal)
Figure 36: Plenum Curb Intermediate Steel Structure Member and Cross Section Details
The base of the unit has structural steel between the floor
of the unit and the curb sealing surface. For plenum curb
applications, extra insulation and sealing is required. Consult
the factory before application with a plenum curb. Refer to
Figure 37: Typical Power Wire Entrance, Curb View, See Project Certified Drawings
Power Wire Entrance (route
wires up from bottom, and route
through provided patch plate)
Summary of Contents for Rebel Applied DPSA
Page 147: ...Figure 181 600 MBH 5 1 Modulation 400 MBH and 600 MBH 10 1 Modulation ...
Page 160: ......
Page 161: ......