Installation
www.DaikinApplied.com 39
IM 1287-4 • REBEL APPLIED ROOFTOP
Figure 73: Hot Water Bypass Valve Package
Steam Coil or Steam Integral Face and
Bypass Coil
Steam coils are provided without valves as a standard unit,
requiring field installation of valves and piping. As an option,the
steam coil is supplied with a two-way valve and actuator motor
from the factory. Refer to the submittal drawings to determine
unit configuration. The submittal drawing will also have
information about the line size connections.
The steam heat coil is pitched at 1/8ʺ (3 mm) per foot (305
mm) to provide positive condensate removal.
Refer to the certified drawings for the recommended piping
entrance locations. All piping penetrations must be sealed to
prevent air and water leakage.
NOTE:
The valve actuator spring returns to a stem up
position upon power failure. This allows full flow
through the coil.
Table 7: Steam Connection Size
Steam Connections
B
Cabinet
All Rows
2”
Figure 74: IFB Steam Heat Section
Su
pp
ly
R
et
ur
n
By
pa
ss
Pipi
ng
Bypass
Valve
Summary of Contents for Rebel Applied DPSA
Page 147: ...Figure 181 600 MBH 5 1 Modulation 400 MBH and 600 MBH 10 1 Modulation ...